Similar Projects
Last Updated | 03/19/2021 08:40 AM |
Project Title | Front Beach Road Segment 3 and Highway 79 |
Physical Address | View project details and contacts |
City, State (County) | Panama City, FL (Bay County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project includes the reconstruction of the Front Beach Road Segment 3 and a portion of Highway 79, a total of 1.193 miles, and the installation of a roundabout at the intersection of these roads. The project includes widening the roadway to include median turn lanes, landscaping, trolley drive lanes, trolley stops, pedestrian walkways, bicycle lanes, signage, lighting, pavement marking, stormwater ponds and drainage system, Lullwater Lake outfall improvements, and the relocation and underground of utilities that are within the right-of-way. The SR 79 portion of the project is located from approximately 200 feet north of the US Highway 98 and SR 79 intersection south to the SR 79 (South Arnold Road) and SR 30 (Front Beach Road) intersection. The Front Beach Road portion of the project is located from approximately 750 feet west of the SR 79 and SR 30 (Front Beach Road) intersection east to approximately 375 feet east of Lullwater Lake Drive. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |