Similar Projects
Resurfacing
Bidding
$5,484,117 est. value
FL

Front Beach Road Segment 4.1 Powell Adams
Bidding
Panama City Beach, FL 32413

Restore Maintenance Road GATR Site
Post-Bid
Panama City, FL

Repair Restore Expeditionary Road
Post-Bid
Panama City, FL 32403

Street Resurfacing Project - FY 2019
Results
Less than $743,500 est. value
Panama City Beach, FL

Bituminous Courses
Results
Less than $524,707 est. value
FL

S. Silver Lake Road Dirt Road Stabilization Project
Bidding
FL 32438

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Hugh Thomas Drive Improvements
Results
Callaway, FL 32404

City-Wide Street Repairs
Post-Bid
Mexico Beach, FL

Widen/Resurface Existing Lanes/Sidewalk
Results
Less than $505,626 est. value
FL

Street Resurfacing Project FY 2021
Post-Bid
Panama City Beach, FL 32413

Roadway Repairs
Results
Less than $980,825 est. value
Lynn Haven, FL

Wildwood Road Improvements
Post-Bid
Less than $422,000 est. value
Panama City Beach, FL 32407

Roadway Repairs
Results
Less than $520,705 est. value
Callaway, FL

Last Updated 03/19/2021 08:40 AM
Project Title

Front Beach Road Segment 3 and Highway 79

Physical Address View project details and contacts
City, State (County) Panama City, FL   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the reconstruction of the Front Beach Road Segment 3 and a portion of Highway 79, a total of 1.193 miles, and the installation of a roundabout at the intersection of these roads. The project includes widening the roadway to include median turn lanes, landscaping, trolley drive lanes, trolley stops, pedestrian walkways, bicycle lanes, signage, lighting, pavement marking, stormwater ponds and drainage system, Lullwater Lake outfall improvements, and the relocation and underground of utilities that are within the right-of-way. The SR 79 portion of the project is located from approximately 200 feet north of the US Highway 98 and SR 79 intersection south to the SR 79 (South Arnold Road) and SR 30 (Front Beach Road) intersection. The Front Beach Road portion of the project is located from approximately 750 feet west of the SR 79 and SR 30 (Front Beach Road) intersection east to approximately 375 feet east of Lullwater Lake Drive.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents