Similar Projects
NM-4 Transmission Line Replacement - Los Alamos County
Infrastructure
Conception
$6,000,000 CJ est. value
Los Alamos, NM 87544

NM-4 Transmission Line Replacement - Los Alamos County
Infrastructure
Conception
$6,000,000 CJ est. value
Los Alamos, NM 87544

Flex Laboratory at the Research Park
New Construction, Infrastructure - 83,000 SF
Design
$23,000,000 CJ est. value
Los Alamos, NM 87544

Composting Improvements Phase II - Los Alamos County
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Los Alamos, NM 87544

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Water Source Improvements Project
Infrastructure
Post-Bid
Los Alamos, NM

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Sherwood Boulevard Roadway and Drainage Improvements
Infrastructure
Results
$150,000 to $200,000 est. value
Los Alamos, NM

Y--NM-Valle De Oro NWR-Water Control Wetland 1 & 2 On
Term Contract
Results
Albuquerque, NM 87105

Aspen School Area Phase 2 Sewer Line R and R - Los Alamos County
Infrastructure
Conception
$268,500 CJ est. value
Los Alamos, NM 87544

Water System SCADA Study
Infrastructure
Post-Bid
Los Alamos, NM

Rainbow Boulevard Improvements Project
Infrastructure
Results

Aspen School Area Pipeline Phase 2 - Los Alamos County
Infrastructure
Conception
$831,000 CJ est. value
Los Alamos, NM 87544

Asphalt and Concrete Recycling
Infrastructure
Post-Bid
Los Alamos, NM

Last Updated 12/05/2022 06:46 PM
Project Title

33rd 34th and Arkansas Road and Utility Improvements Project

Physical Address View project details and contacts
City, State (County) Los Alamos, NM 87544   (Los Alamos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,364,770 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of Dec 5 the project was awarded to TLC Plumbing & Utility for $3,364,769.80. 33rd 34th and Arkansas Road and Utility Improvements Project All forms of bribes, gratuities, and kickbacks are prohibited by state law. The County of Los Alamos is an Equal Opportunity Employer

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents