Similar Projects
SS 502 - Bicycle and Pedestrian Improvements
Infrastructure
Bidding
$260,728 est. value
TX

Culverts
Term Contract, Infrastructure
Sub-Bidding
Bastrop, TX

P32 Parking Lot
Post-Bid
Stephenville, TX

Reclamation and Resurfacing of Parking Lots at Irwin Park and Guy Berry Park
Infrastructure
Post-Bid
Balch Springs, TX 75180

Construction of Water, Sanitary, and Drainage Facilities in Lago Mar Pod 9 Section 1
Results
TX

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Orchard Park Lane Phase 2
Results
Less than $2,333,740 est. value
TX

Campus Sidewalks and Road Repairs
Infrastructure
Post-Bid
Gainesville, TX

Elizabeth Avenue Realignment Project
Results
Less than $1,245,265 est. value
New Braunfels, TX 78130

Culverts
Infrastructure
Post-Bid
TX

Water, Sanitary Sewer, and Drainage Facilities to Serve Tamarron Section 44
Results
Less than $1,092,745 est. value
TX

Tract 2C Improvements (Public)
Infrastructure
Post-Bid
TX

Water, Sewer and Drainage Improvements for Hagerson Road Tract Section Three
Results
Sugar Land, TX 77479

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Water, Sanitary, Drainage, and Paving Facilities to Serve Lago Mar Boulevard and Water Plant Reserve
Results
TX

Upsala Drive Drainage Improvements
Infrastructure
Post-Bid
El Paso, TX 79928

Reported 04/28/2022 12:00 AM
Project Title

CSP for Extension of Post Oak Drive

Physical Address View project details and contacts
City, State (County) Fredericksburg, TX   (Gillespie County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project primarily consists of the construction of a new driveway, concrete curb, drainage culvert, two course surface treatment street section terminating in a cul-de-sac located on a vacant property adjacent to the proposed new Middle School at Highway 16.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents