Last Updated | 01/04/2023 07:03 PM |
Project Title | LRRT - 400 Block Rail Replacement Precast Concrete Panels |
Physical Address | View project details and contacts |
City, State (County) | Buffalo, NY 14202 (Erie County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,437,970 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Authority is in the Design Phase of a Light Rail System project that includes track replacement. The project design is scheduled for completion in Fall 2022 with phased construction starting in early 2023. As such, the Authority finds it necessary to procure long-lead delivery items, such as Precast Track Panels, to meet the construction schedule for rail systems. The Work of this Contract includes supply and delivery of the specified Precast Track Panels which will be installed under a separate construction contract starting in June 2023. Work includes engineering, design, testing, manufacturing, fabrication, assembly, furnishing and delivery of the specified materials including assemblies and components, obtaining contract bonds, import/export tariffs and any other work related to completion of this Agreement. The NFTA reserves the right to waive irregularities, to reject any or all bids and to extend the bidding period. Bid security must accompany each bid and must be in an amount not less than ten percent of the total bid price if the base bid exceeds $50,000.00. Bid security may be submitted prior to bid opening either electronically utilizing Surety2000 at portal, or delivered to the NFTA in an opaque sealed envelope. Details for electronic submission are provided on the NFTA's Engineering Branch website. In the event a bidder utilizes an offline bid but provides bid security electronically the electronic bid bond number must be submitted with the offline bid. The Contractor shall perform not less than 50% of the Work with its own forces. The time of completion for the project is 511 calendar days after receipt of the Notice to Proceed. Liquidated damages will be assessed against the Contractor for its failure to complete the project within the time specified. Refer to Technical Specification Section 01 11 00 "Summary of Work" for additional time constraints and associated liquidated damages. Pre-bid questions electronic submission only are due by 3:00 pm November 10th, 2022. M/WBE participation shall be 0% MBE and 2% WBE. SDVOB participation shall be 0%. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 2% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Location: 400 Block, Main Street, Buffalo NY 14203 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |