Similar Projects
Refrigeration Maintenance and Service
Term Contract
Bidding
CO

Fire Station 2 and Fire Station 4 Condenser and Heater Replacement
Post-Bid
$45,000 to $55,000 est. value
Aurora, CO 80012.

NEJC DQ-20-006 HVAC Cafeteria Rooftop Replacement Units
Post-Bid
Sterling, CO

ERWSD Administration Building - VRF Renovation (Engineer)
Results
Less than $500,000 est. value
Vail, CO 81657

Sustain Repair Air Handler Units - West Fairchild Hall
Results
$1,000,000 to $5,000,000 est. value
Black Forest, CO 80840

SB267 Replace Chiller and Chilled Water Loop - Downtown Capitol Complex
Post-Bid
$2,100,000 est. value
Denver, CO

SB267 Upgrade HVAC Systems Group Homes Wheat Ridge Regional Center Phases 1 & 2
Results
$750,000 est. value
Wheat Ridge, CO 80033

Design/Build for Replacement of Computer Room Air Conditioners (CRAC)
Post-Bid
Aurora, CO 80016

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

Air Conditioning - Design Build
Post-Bid
Boulder, Louisville, CO

Regional Center Capital Improvements GJRC Group Home A/C FY 17-18
Results
$278,910 est. value
Grand Junction, CO 81504

Heating, Air Conditioning, Ventilation Maintenance and Repair Services
Term Contract
Post-Bid
Aurora, CO 80012

Replace Obsolete Control Lakes Library
Results
$225,000 est. value
Golden, CO 80401

HVAC Control System Upgrade for Arvada Library
Post-Bid
Arvada, CO 80002

Building Automation/Hvac Replacement Project
Results
Fort Collins, CO 80521

Last Updated 06/11/2021 06:35 PM
Project Title

HVAC System at Manaugh Elementary

Physical Address View project details and contacts
City, State (County) Cortez, CO 81321   (Montezuma County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor responsible for developing a design in accordance with plan review by District, Empire Electric and in adherence with state and local building codes. Consultation should be made with District regarding the presence of asbestos containing materials. Specific design components include: 1. High efficiency heating and cooling heat pump design -roof mount units preferred -properly sized evaporators for each room -central controls 2. Electrical upgrade to 208/3 phase must support all existing building systems. 3. Provide electrical service from pole to new transformer and to all interior units 4. Necessary trenching/excavation to install pad-mount transformer near building. 5. Necessary permitting and line locates 6. Use of certified asbestos-free components and materials 7. System training upon project completion 8. Adhere to manufacturer’s specifications for all phases of installation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents