Similar Projects
Inflow and Infiltration Rehabilitation
New Construction
Results
Charleston, WV

Water System Improvements
New Construction
Results
$9,255,000 est. value
Fairmont, WV 26554

Gerrardstown Pump Station, Forcemain and Wastewater Treatment Plant Decommission Project
New Construction
Results
Charleston, WV

Lift Station Improvements
New Construction
Results
$1,200,000 est. value
Charleston, WV

11th Street Pump Station Stabilization
Infrastructure
Results
Huntington, WV 25701

Contract IIIG Wastewater Collection and Treatment System Improvements
Alteration
Results
$8,995,000 est. value
Wheeling, WV

Biennial Construction and Maintenance Contract
New Construction, Infrastructure
Post-Bid
Charleston, WV

Midway Pump Station Building
New Construction
Post-Bid
Bluefield, WV

Franklin Elementary Sewer Extension
Renovation, Infrastructure
Results
Wellsburg, WV 26070

SAPP's Run and State Route 73 Sewage Lift Station Replacements
New Construction
Results
Fairmont, WV

Exit 1 Development
Infrastructure
Results
Bluefield, WV

Olympia Fields Booster Station Relocation Project
Renovation
Results
Scott Depot, WV

Chesterfield, James Street and Roosevelt Lift Station Improvements
Renovation
Bidding
Charleston, WV 25304

Last Updated 12/16/2021 12:12 PM
Project Title

Wastewater Pump Stations Improvements Project

Physical Address View project details and contacts
City, State (County) Ansted, WV   (Fayette County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be bid upon is described as follows: The Contract shall consist of the relocation of Pump Station No. 1 (including new wet well, valve vault, submersible pumps, controls, piping, fencing, generator and new forcemain), upgrade of Pump Station No. 2 (including installation of new wetwell, submersible pumps, controls, piping, fencing and generator), modifications of 6 other submersible pumping stations (including replacement of pumps, plug and check valves, guide rails, controls, control panels, base elbows and piping (if shown on drawings), installation of a new Community Center pump station (including force main, manhole and connection to existing gravity sewer system) installation of new telemetry system, site sign, site grading and gravel at the pump stations, site restoration, temporary bypass pumping, special fill material, video-taping, mobilization / demobilization, office trailers, purchase and delivery of a trailer-mounted sewer jetter, mini excavator, trailer-mounted diesel driven pump and service truck with tools and all other appurtenances shown on the plans and/or detailed in the specifications that are necessary for a complete and operable The total construction time for this contract is limited to three hundred sixty-five (365) consecutive calendar days from the date specified in the contract documents.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents