Similar Projects
Last Updated | 09/18/2021 02:57 AM |
Project Title | Removal of Vermilion River Dam on the Vermilion River at Oglesby, Il and Bank Stabilization in the Vicinity of the Dam |
Physical Address | View project details and contacts |
City, State (County) | IL (La Salle County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 20100500 Acre Tree Removal, Acres Base Items 0.700 20101100 Each Tree Trunk Protection Base Items 20.000 20200100 Cu Yd Earth Excavation Base Items 107.000 20200200 Cu Yd Rock Excavation Base Items 345.000 20700220 Cu Yd Porous Granular Embankment Base Items 2,967.000 21101625 Sq Yd Topsoil Furnish And Place, 6" Base Items 3,727.000 28000400 Foot Perimeter Erosion Barrier Base Items 1,418.000 67000500 Cal Mo Engineer's Field Office, Type b Base Items 5.000 67100100 l Sum Mobilization Base Items 1.000 |
||||||
Details | Dam/Tunnel, New Construction.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |