Similar Projects
Replacement of Ceiling Lifts at Minnesota Veterans Homes
Alteration
Results
$300,000 est. value
Fergus Falls, Luverne, Minneapolis, Silver Bay, MN 56156

Replacement of Ceiling Lifts at Minnesota Veterans Homes
Alteration
Results
$300,000 est. value
Fergus Falls, Luverne, Minneapolis, Silver Bay, MN 56156

Replacement of Ceiling Lifts at Minnesota Veterans Homes
Alteration
Results
$300,000 est. value
Fergus Falls, Luverne, Minneapolis, Silver Bay, MN 56156

Replacement of Ceiling Lifts at Minnesota Veterans Homes
Alteration
Results
$300,000 est. value
Fergus Falls, Luverne, Minneapolis, Silver Bay, MN 56156

Elevator Maintenance, Inspection, and Repair
Post-Bid
MN

Elevator Inspection and Repair Services
Term Contract
Post-Bid
Duluth, MN 55806

Soudan Underground Mine Shaft Rehab
Renovation, Alteration
Post-Bid
MN 55782

West CBIS TSA Recapitalization
Results
MN

Elevator Repair and Maintenance
Alteration
Post-Bid
Minneapolis, MN

Replacement of the Two Elevators at Colleen Loney Manor (CLM)
Results
MN 55118

UMD NRRI Duluth Elevator Replacement
Renovation
Results
Duluth, MN 55811

Last Updated 10/25/2021 02:46 PM
Project Title

Y1DA-- 618-21-2-6023-0015 - Service - Install Vehicle Lift - MPLS

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55417   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Minneapolis Veteran Affairs Health Care System (MVAHCS) requires the installation of a vehicle lift that can lift up to 10,000 lbs. Installation will meet or exceed all Mohawk lift recommendations . Install a concrete slab that will support a vehicle lift in the bay of Building 72 located across the street from the main hospital. Remove a section of concrete floor with minimum dimensions of 14 ft x 6 ft located in bldg. 72 Grounds Maintenance Bay. Prepare base and install rebar in accordance with New Slab Recommendations outlined in the Mohawk TP-16 lift installation manual. Pour and finish new slab (Minimum 12 inches thick) with necessary re-enforcement. Mix will be salt resistant and rated at 5000 PSI. Hand mixed concrete is not authorized an will not be used After full cure of concrete (minimum 28 days), Install/assemble Mohawk lift. System will be anchored with twenty wej-it anchors that are a minimum of ¾ diameter and measure 6 inches long. Project Deducts: None. Expected Asbestos or Lead: None The Period of Performance is expected to be 60 calendar days from the receipt of the Notice-To-Proceed (NTP).

Details

Division 14 - Conveying Equipment, Vehicle Lifts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents