Similar Projects
Wastewater Lift Station No. 5 Decommissioning - 500269 - City of Roseville
Demolition, Infrastructure
Conception
$375,000 est. value
Roseville, CA 95747

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Sunset Whitney Recreation Area East Pathway Phase II Project
Infrastructure
Bidding
$200,000 est. value
Rocklin, CA 95677

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Bickford Ranch Backbone Concrete
Alteration
Post-Bid
Lincoln, CA 95648

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

2021 Roadway Hot Mix Asphalt Overlay Project
Infrastructure
Results
$1,700,000 est. value
CA

Paving and Striping Services
Infrastructure
Post-Bid
Roseville, CA

Excavate Roadway, Place Cl2-AB and HMA (Type A) to Construct Turnouts
Infrastructure
Results
$1,230,000 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Realign Roadway, Construct Roundabout and Relocate Sewer Lines
Infrastructure
Results
$4,220,000 est. value
CA

2022 Patch Paving
Infrastructure
Post-Bid
$700,000 est. value
Tahoe City, CA

Replacement of Asphalt Concrete in Various Locations
Infrastructure
Results
Tahoe Vista, CA

2022 Road Reconstruction Project
Infrastructure
Post-Bid
$4,500,000 est. value
Truckee, CA 96161

Foresthill Road High Friction Surface Treatment
Infrastructure
Results
CA

Reported 06/30/2022 03:25 PM
Project Title

Stoneridge Parcel 58 Bike Trail - Miner's Ravine to Orvietto Drive - 500262 - City of Roseville

Physical Address View project details and contacts
City, State (County) Roseville, CA 95678   (Placer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,330,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Roseville, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. This project will design and construct a multi-use bike/pedestrian trail through Stoneridge Parcel 58 from Miner's Ravine to Orvietto Drive Project is included in the City of Roseville's FY 2022-2027 Budget CIP. As of June 29, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated from FY 2022 to FY 2026.* A firm timeline for construction has not been determined, however construction is anticipated to be completed by June 30, 2026.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents