Similar Projects
Cherokee National Forest Road Maintenance IDIQ
Term Contract
Design
Del Rio, Tellico Plains, TN 37727

Cherokee National Forest Road Maintenance IDIQ
Term Contract
Design
Del Rio, Tellico Plains, TN 37727

Paving Project
Infrastructure
Bidding
$300,000 est. value
Sneedville, TN

Fulton Courtyard - Southwest Tennessee Community College
Infrastructure
Bidding
$300,000 est. value
Memphis, TN 38134

Asphalt Walking Trail
Post-Bid
Greenback, TN

Asphalt - Paving in Place
Term Contract
Post-Bid
TN

St. Elmo Riverwalk 4 Extension
Results
Chattanooga, TN 37409

The Resurfacing on I-840 From Leipers Creek Road (L.M. 12.48) to Thompson Station Road (L.M. 18.20)
Results
TN

Asphalt
Infrastructure
Bidding
Carthage, TN

Resurfacing, Sidewalk Improvements
Post-Bid
Harriman, TN

The Resurfacing on S.R. 93 From Near I-26 (L.M. 6.21) to Near U.S. 11W (S.R. 1) (L.M. 11.33), Including Bridge Deck Repair
Results
TN

Resurfacing on S.R. 54
Infrastructure
Bidding
$500,000 est. value
Greenfield, TN 38230

Micro-Surfacing
Term Contract
Post-Bid
Carthage, TN

The Resurfacing on S.R. 13 From Near the Red River Bridge (L.M. 21.65) to Near Fairview Lane (L.M. 23.94)
Results
TN

Resurfacing on S.R. 164, Resurfacing on U.S. 70 (S.R. 24)
Infrastructure
Bidding
$3,000,000 est. value
Livingston, TN

Reported 06/03/2022 12:00 AM
Project Title

Summer Oaks Cove Paving

Physical Address View project details and contacts
City, State (County) Brownsville, TN 38012   (Haywood County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The project consists of milling the existing surface asphalt and placing 1-1/2" of new asphalt on Summer Oaks Cove and Loop Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents