Similar Projects
Wooten Farm Residential Development
New Construction, Infrastructure
Conception
$65,400,000 CJ est. value
Winston-Salem, NC 27284

Polo Road Townhouses
New Construction, Infrastructure
Conception
$16,200,000 CJ est. value
Winston Salem, NC 27105

Grove Park
New Construction, Infrastructure
Design
$12,131,000 CJ est. value
Clemmons, NC 27012

Hanes Mill Storage
New Construction, Infrastructure - 129,500 SF
Design
$14,000,000 CJ est. value
Winston Salem, NC 27105

Cedar Trail & Petree Road Sidewalks Improvements
Infrastructure
Bidding
$2,500,000 CJ est. value
Winston Salem, NC 27101

Cedar Trail & Petree Road Sidewalks Improvements
Infrastructure
Bidding
$2,500,000 CJ est. value
Winston Salem, NC 27101

Town of Lewisville, Williams Rd Gateway Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Lewisville, NC 27023

Town of Lewisville, Williams Rd Gateway Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Lewisville, NC 27023

Grading, Drainage, Paving and Structure
Infrastructure
Results
$2,000,000 est. value
Winston-Salem, NC 27114

Surfacing, Resurfacing, Pavement Repair, Pavement Markings, As Needed
Term Contract, Infrastructure
Results
$6,000,000 est. value
Winston-Salem, NC

Union Cross Industrial Center - Lot 4
New Construction, Infrastructure - 144,000 SF
Construction
$15,600,000 CJ est. value
Winston Salem, NC 27107

Union Cross Industrial Center - Lot 4
New Construction, Infrastructure - 144,000 SF
Construction
$15,600,000 CJ est. value
Winston Salem, NC 27107

Rosewood Place
New Construction, Infrastructure
Pending Verification
$9,800,000 CJ est. value
Winston Salem, NC 27103

Rosewood Place
New Construction, Infrastructure
Pending Verification
$9,800,000 CJ est. value
Winston Salem, NC 27103

Loves Travel Stop and Country Store - Shore Road / Winston Salem
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Rural Hall, NC 27045

Last Updated 01/05/2024 09:58 AM
Project Title

Easton Community Center

Physical Address View project details and contacts
City, State (County) Winston Salem, NC 27107   (Forsyth County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $220,700 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 18, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. The scope of work on this project involves relocating and refurbishing an existing mobile trailer/classroom unit at the Easton Elementary School site, to be repurposed into a Community Center space. There will be minimal site/civil work in preparing the new pad location and stairs/ramps and sidewalks; hauling the trailer across the site to its new location; some structural foundation work; limited plumbing and electrical work tying back into utilities at the new location; and some interior walls and finishing work. Technical questions concerning this bid should be submitted in writing to John Faron at jfaron@moseleyarchitects.com by 5:00PM, Monday, February 20, 2023. Compliance with the City of Winston-Salem's M/WBE program is required in accordance with the Instructions to Bidders contained in the specifications. The M/WBE subcontracting goals for this project are 10% MBE, 9% WBE and must be met separately. The low bidder who fails to meet said goals must submit Affidavit 'D' and their full Good Faith Effort documentation within 24 hours. Likewise, an Affidavit 'C' is required of the apparent low bidder who meets the M/WBE goals.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents