Similar Projects
Highway Safety Improvements
Infrastructure
Bidding
South Portland, ME

Road Resurfacing, Reclamation, and Other Road Repair Services
Post-Bid
Portland, ME

Crack Sealing Services
Term Contract, Infrastructure
Post-Bid
Portland, ME

Highway Safety Improvements
Results
Westbrook, ME

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Less than $1,258,000 est. value
South Portland, ME 04101

Repair Pavement Main Entrance South Portland Air National Guard Station (SPANGS)
Infrastructure
Post-Bid
$47,000 est. value
South Portland, ME 04106

Andrews Square Intersection Improvements
Results
$400,000 est. value
Portland, ME

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Park and Ride Shim and Overlay
Results
Portland, ME 04019

2022-2023 Bituminous Concrete and Paving Related Services
Term Contract
Post-Bid
Westbrook, ME

Gravel Road Construction
Results

Intersection Improvements/Located on Route 77
Results
South Portland, ME

Kennebec Street Corridor Improvements
Results
Less than $376,000 est. value
Portland, ME 04101

Somerset Street Restoration
Results
Less than $929,000 est. value
Portland, ME 04101

Exit 45 Interchange Reconfiguration Mile 44.9
Results
Less than $28,600,000 est. value
Portland, South Portland, ME

Last Updated 02/21/2022 09:32 AM
Project Title

Kettle Cove Road Phase 2 Improvements

Physical Address View project details and contacts
City, State (County) Cape Elizabeth, ME 04107   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes: installation of storm drain pipe and structures, earthwork, construction, landscaping, and associated work as shown on contract drawings and documents. Work also includes (under separate contract with the Portland Water District) water main renewal work in the project limits. The Kettle Cove Road Phase 2 Improvements begins on the northern end of Kettle Cove Road at the intersection with Bowery Beach Road and extends a distance of approximately 2,000 feet southerly to the intersection of Fessenden Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents