Similar Projects
Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Design
$10,000,000 CJ est. value
Spokane Valley, WA 99206

Latah Creek Golf Course Parking Lot Improvements
Infrastructure
Bidding
$476,321 est. value
Spokane, WA 99223

Latah Creek Golf Course Parking Lot Improvements
Infrastructure
Bidding
$476,321 est. value
Spokane, WA 99223

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Bigelow Gulch Road Project Six
Alteration
Post-Bid
Spokane, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

2022 Paving Unpaved Streets - North
Infrastructure
Bidding
$250,000 to $500,000 est. value
Spokane, WA

Evergreen Road Preservation
Infrastructure
Post-Bid
Spokane Valley, WA

Pedestrian Ramp Replacement
Infrastructure
Results
Deer Park, WA

Asphalt and Concrete Services
Term Contract
Bidding
Colville, Spokane, Spokane Valley, WA 99202

Spokane Airport Board Unit Price Airside Pavement Rehabilitation
Term Contract
Post-Bid
Spokane, WA 99224

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

44th Avenue -Crestline Street to Altamont Street
New Construction, Infrastructure
Bidding
$200,000 est. value
Spokane, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Reported 06/14/2022 12:00 AM
Project Title

Cycle 9 Traffic Calming Projects

Physical Address View project details and contacts
City, State (County) Spokane, WA   (Spokane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of approximately 450 square yard of sidewalk, 600 linear feet of curb or curb and gutter, 300 square yards of HMA pavement repair, 1 Pedestrian Hybrid Beacon, 2 drainage structures, sundry utility adjustments, and other related miscellaneous items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents