Similar Projects
Portland Cement Concrete
Alteration
Post-Bid
Modesto, CA

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Fink Road Landfill Concrete Work for Heavy Equipment Wash Station
Alteration
Results
Crows Landing, CA 95313

Concrete Services for High Voltage Repairs and MISC Traffic Electrical Repairs
Term Contract
Post-Bid
Modesto, CA

Replace Jointed Plain Concrete Pavement
Alteration
Results
$3,800,000 est. value
CA

2 Inmate or Ward Labor Program Concrete Pumping Services
Alteration
Post-Bid
$6,995,500 est. value
Sacramento, CA

Construct Pervious Concrete,Minor Concrete,HMA and Modify Landscape
Alteration
Results
$880,000 est. value
San Diego, CA 92104

BC Welcome Center Concrete Slab on Grade Corrections and Replacement
Alteration
Post-Bid
Bakersfield, CA 93314

Hemet Concrete Repairs
Alteration
Results
Hemet, Riverside, CA 92507

Concrete Services for High Voltage Repairs and Misc Traffic Electrical Repairs
Alteration
Post-Bid
Modesto, CA

Concrete Repair Services
Term Contract, Alteration
Results
$200,000 est. value
San Jose, CA

California Highway Patrol (CHP) Contra Costa Area office - Concrete Pad Installation Services
Term Contract
Post-Bid
Martinez, CA 94553

Omnibus Concrete Repairs
Alteration
Results
$450,000 est. value
Santa Ana, CA 92799

Annual Concrete Maintenance Contract
Term Contract
Post-Bid
Healdsburg, CA

Last Updated 08/30/2022 05:06 PM
Project Title

Street Reconstruction Group 1801

Physical Address View project details and contacts
City, State (County) San Diego, CA 92101   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $10,200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

2116 6280407-1910444, 266-1725 Atlas No. 180322P4.4, Report No. 1R5 1. SLBE participation 11.6% 2. ELBE participation 13.5% 3. Total mandatory participation 25.1% The Citys estimated construction cost for this project is $10,200,000. Any questions related to this solicitation shall be submitted to: JEEspindola@sandiego.gov License Requirements A Bid Valid 120 Calendar Days Liquidated Damages $1,000 Per Day Estimated Bid Value $10,200,000.00 Start/Delivery Date Project Duration 217 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting No Online Q&A No The scope of work for this project involves furnishing all labor, materials, equipment, services and construction which include pavement reconstruction utilizing the full depth reclamation method and slurry seal, replacing traffic signal detection loops and stub outs, adjustment of city manholes and gate valve covers, installation of curb ramps to meet ADA requirements, installation of pedestrian barricades at prohibited crossing movements, installation of bus pads, replacing damaged sidewalks, tree removal, root pruning and barrier, curb & gutter and cross gutters, replacing traffic striping/markings, signs and legends, installation of storm drain pipes, cleanouts and inlets, and installation of modular wetland systems within project drainage management area along Gold Coast Drive between Thanksgiving Lane to Camino Ruiz and Park Dale Avenue between Northrup Drive and Mira Mesa Boulevard. This project will also include segments of water main replacement.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents