Similar Projects
Last Updated | 08/30/2022 05:06 PM |
Project Title | Street Reconstruction Group 1801 |
Physical Address | View project details and contacts |
City, State (County) | San Diego, CA 92101 (San Diego County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $10,200,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 2116 6280407-1910444, 266-1725 Atlas No. 180322P4.4, Report No. 1R5 1. SLBE participation 11.6% 2. ELBE participation 13.5% 3. Total mandatory participation 25.1% The Citys estimated construction cost for this project is $10,200,000. Any questions related to this solicitation shall be submitted to: JEEspindola@sandiego.gov License Requirements A Bid Valid 120 Calendar Days Liquidated Damages $1,000 Per Day Estimated Bid Value $10,200,000.00 Start/Delivery Date Project Duration 217 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting No Online Q&A No The scope of work for this project involves furnishing all labor, materials, equipment, services and construction which include pavement reconstruction utilizing the full depth reclamation method and slurry seal, replacing traffic signal detection loops and stub outs, adjustment of city manholes and gate valve covers, installation of curb ramps to meet ADA requirements, installation of pedestrian barricades at prohibited crossing movements, installation of bus pads, replacing damaged sidewalks, tree removal, root pruning and barrier, curb & gutter and cross gutters, replacing traffic striping/markings, signs and legends, installation of storm drain pipes, cleanouts and inlets, and installation of modular wetland systems within project drainage management area along Gold Coast Drive between Thanksgiving Lane to Camino Ruiz and Park Dale Avenue between Northrup Drive and Mira Mesa Boulevard. This project will also include segments of water main replacement. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |