Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Post-Bid
Less than $1,158,847 est. value
Jacksonville, FL 32099

Construct North 7th Street Sidewalk
Term Contract
Post-Bid
Lantana, FL 33462

SW 27th Multi-Use Path
Results
Less than $367,000 est. value
Gainesville, FL

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Salt Lake (Entry Improvements)
Post-Bid
Less than $75,000 est. value
Mims, FL 32754

City of Freeport - Pool Parking Lot Paving
Results
Less than $39,266 est. value
Freeport, FL

City of Plant City Sidewalk Improvements
Post-Bid
Plant City, FL 33564

Concrete Horizontal Cutting on Public Walking Surfaces - ADA Compliance
Results
Less than $100,000 est. value
Tampa, FL 33601

Osceola Technical College (TECO) Parking Lot Expansion
Post-Bid
Kissimmee, FL 34744

Sidewalk Restoration Services
Term Contract
Results
Miramar, FL

Sidewalk Replacement at Public Housing Property
Post-Bid
Eustis, FL 32726

Six Mile Cypress Shared use Path from Winkler Avenue to Challenger Boulevard
Results
Less than $145,666 est. value
Fort Myers, FL 33901

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

Last Updated 12/31/2019 12:42 AM
Project Title

CR 473 Sidewalk (Fountain Lake Boulevard to Haines Creek Road)

Physical Address View project details and contacts
City, State (County) Tavares, FL 32778   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $843,190
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the construction of two five-foot wide concrete side- walk sections along the east side of CR 473 to provide students a safe route to Treadway Elementary School. The total project length is 7,510 feet, approximately 1.42 miles. All concrete sidewalk shall be 4 thick except for driveway and other turnout locations, those locations should have 6 thick concrete sidewalk. The first section is from the south side of the entrance of Fountain Lake Boulevard and ties into an existing sidewalk approximately 600 feet south of Camp Street. The length of the first section is approximately 0.65 miles. The second section is from south side of Camp Street to north side of South Haines Creek Road. The length of the second section is approximately 0.66 miles. The improvements will include: mobilization, maintenance of traffic, sediment barrier, clearing and grubbing and other site preparation, concrete gravity walls, drainage improvements (ditch bottom inlets, pipe culverts, mitered end sections, regrading ditches), pedestrian/bicycle railing, concrete sidewalk (2500 psi with fiber reinforcement), detectable warning surfaces (meeting both FDOT and Lake County standards), sodding, signing and pavement markings, concrete removal, asphalt for turnout re-construction, and concrete for drive- way reconstruction.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents