Similar Projects
Central Fire Station Interior Renovation
Renovation
Conception
$125,000 est. value
Colleyville, TX

Electrical Equipment Rehabilitation and Replacement MATOC
Design
Fort Worth, TX

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Arlington Gateway Monument SH 360 Southbound
Infrastructure
Bidding
$600,000 est. value
Arlington, TX 76001

Construction Manager at Risk (CMaR) Services Project 138, District-Wide Emergency Power
Alteration
Bidding
Saginaw, TX

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

Outside Contracted Services
Post-Bid
Arlington, TX

Electric Microgrid System
Results
Arlington, TX 76019

Miller Avenue Generator Additions
Results
$474,760 est. value
Fort Worth, TX

Facility A/C Bacnet Repair
Post-Bid

EV Charging Stations at EAD and South Control Plaza
Results
$289,431 est. value
Fort Worth, TX

Liebert UPS System and Maintenance
Alteration
Post-Bid
Fort Worth, TX

EGSE Charging Stations at Terminal E
Results
$1,330,031 est. value
Fort Worth, TX

TCWSP - Process Controls Maintenance Services
Term Contract
Post-Bid
TX

Annual Requirements Contract for Generator Maintenance
Results
Arlington, Euless, Fort Worth, TX 76010

Reported 07/08/2022 12:00 AM
Project Title

Universal Power Supply (UPS) Equipment Service Contract

Physical Address View project details and contacts
City, State (County) North Richland Hills, TX   (Tarrant County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract shall be valid from October 1, 2022 through September 30, 2023 with four (4) one-year options to renew if agreeable by both parties in writing. Contract may be increased annually by 3% or the Consumer Price Index of the Dallas/Fort Worth area, whichever is lower. Increases to the contract above 3% or the Consumer Price Index of the Dallas/Fort Worth area will require a re-negotiating of the contract

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents