Similar Projects
Blue Ridge Parkway
Term Contract, Infrastructure
Design
$2,000,000 to $5,000,000 est. value
VA

Almond Creek Interceptor Creek Crossing Replacement and Creek Stabilization
Bidding
Less than $3,500,000 est. value
Richmond, VA

Beaton and Sykes Level 1 Wet Pond
Infrastructure
Bidding
Portsmouth, VA

Z--COLO 253093 York River Shoreline Stabilization 2B
Post-Bid
$10,000,000 est. value
Yorktown, VA

Water Management Infrastructure
Post-Bid
Suffolk, VA 23434

NASA Wallops Beach Renourishment (Backpassing)
Results
$10,000,000 to $25,000,000 est. value
Wallops Island, VA 23303

Chincoteague NWR, VA Remove and Replace Water Control Structures
Results
Chincoteague, VA

Happy Creek Sanitary Rehabilitation and Stabilization Plan
Infrastructure
Bidding
Newport News, VA 23602

Drainage Repairs at Paul D. Camp Community College, Franklin Campus
Post-Bid
Franklin, VA 23851

Lynnhaven River Basin Ecosystem Restoration, Phase 1 Reef Habitat
Results
$1,000,000 to $5,000,000 est. value
Virginia Beach, VA

Maintenance Plan for Bioretention Facility and Drainage Channel
Infrastructure
Bidding
Lynchburg, VA 24502

Concrete Pipe
Post-Bid
Lebanon, VA 24266

Design-Bid-Build, P653 Dry Dock Flood Protection Improvements
Results
$25,000,000 to $100,000,000 est. value
Portsmouth, VA

Southern Virginia Megasite at Berry Hill Lot 1 and 2 Graded Pad
Infrastructure
Bidding
Danville, VA

Dry Run Bank Stabilization Project
Infrastructure
Post-Bid
Covington, VA

Reported 02/25/2022 12:00 AM
Project Title

Fire Station Driveway Culvert Replacement

Physical Address View project details and contacts
City, State (County) Glade Spring, VA   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of the existing Glade Spring Fire Station driveway, together with approximately 100 linear feet of 83"x57" CMP arch pipe and 84" diameter steel pipe, replacement with 77"x52" CMP pipe arch, and reconstruction of the fire station driveway near the intersection of East Glade Street and Crescent Drive in Glade Spring, Virginia.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents