Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Illinois Bridge Pedestrian Crossing Improvements - City of Mason City
Infrastructure
Conception
$200,000 CJ est. value
Mason City, IA 50401

Cedar River Safety and Recreational River lmprovements Phase I - City of Cedar Falls
Infrastructure
Design
$4,831,000 est. value
Cedar Falls, IA

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

Well 5 Reconfiguration
Infrastructure
Results
$129,300 est. value
Waverly, IA 50677

South Main Street Water Main Replacement
Infrastructure
Results
$375,000 est. value
Boone, IA 50036

Cedar Heights Drive Reconstruction - 111 - City of Cedar Falls
Infrastructure
Construction
$7,173,000 CJ est. value
Cedar Falls, IA 50613

Union at North Crossing
New Construction, Infrastructure
Pending Verification
$68,000,000 CJ est. value
Waterloo, IA 50703

Aikey Auto Salvage Storage Building
New Construction, Infrastructure - 5,200 SF
Pending Verification
$560,000 CJ est. value
Waterloo, IA 50703

Downtown Lot Improvements - City of Cedar Falls
Infrastructure
Conception
$300,000 CJ est. value
Cedar Falls, IA 50613

Water Meter Replacement
Infrastructure
Post-Bid
$800,000 est. value
Hazleton, IA

Highway 38 - Cedar Street Improvements
Infrastructure
Results
Tipton, IA 52772

A-Line EDS Warehouse
New Construction, Infrastructure - 26,240 SF
Pending Verification
$3,000,000 CJ est. value
Waterloo, IA 50703

Gibson Property Development - Phase I - 2 - City of Cedar Falls
New Construction, Infrastructure
Conception
$500,000 CJ est. value
Cedar Falls, IA 50613

Last Updated 07/18/2023 09:32 AM
Project Title

Trinity Lutheran Church - Bathroom Addition

Physical Address View project details and contacts
City, State (County) Creston, IA 50801   (Union County)
Category(s) Heavy and Highway, Religious/Funeral, Sewer and Water
Sub-Category(s) Religious Facility, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $95,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Project put on hold per Architect The Project consists of partial demolition of the former east entry and construction of a Bathroom Addition with basement below. The work includes Demolition, Concrete, Metal fabrication, Wood framing and trims, Asphalt Shingles, Seamless Gutters, Door Systems, Gyp. Board Assembiles, Wall and Floor tile, Paint, Mechanical, Electrical, and Plumbing, Sitework, Ground and Storm Drainage Systems. The Prime Contractor submitting the Bid shall provide and coordinate all Work required for this Project. Starting time for construction shall be within ten (10) days after the written Notice to Proceed is issued. The estimated starting date on site is Monday, April 4, 2022. Preparation and ordering of materials shall occur prior to the start of construction. Substantial Completion of the project shall be no later than Friday December 2 2022 Bidders may seek clarification of the drawings and specifications from the Architect and propose substitutions prior to the opening of Bids until 12:00 Noon, Wednesday, March 2, 2022 at which time no further information will be provided other than what is shown in the Drawings and Project Manual. The purpose for the deadline is to insure adequate time for preparation and issuance of an addendum, if needed, on Friday, March 4, 2022. It is the intention of this request that addenda after this date may not be necessary Bids submitted to the Owner must be accompanied by cash, certified check of the bidder, or a bid bond submitted in a separate envelope in the amount of 5% of the bid and made payable to Trinity Lutheran Church. Such cash, checks or bid bonds will be returned to all except the three lowest bidders within three (3) days after the opening of bids and the remaining cash, checks or bid bonds will be returned promptly after the Owner and the accepted Bidder have executed the Contract, or if no award has been made within thirty (30) days after date of the opening of bids, upon demand of the Bidder at any time thereafter, so long as he has not been notified of the acceptance of his bid. Conditional bids will not be accepted. The right is reserved, as the interest of the Owner may require, to reject any and all bids, to waive any informality in bids received, and to accept or reject any item of any bid unless such bid is qualified by specific limitation. Bids may not be withdrawn for thirty (30) consecutive calendar days of opening. As of July 18, 2023 no new information available

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents