Similar Projects
Norumbega Covered Storage Tank Cell No. 2 Cleaning
Infrastructure
Bidding
Weston, MA

Rehabilitation of North Water Tank
Infrastructure
Bidding
$400,000 est. value
Leicester, MA

Water Tanks Maintenance and Asset Management
Term Contract
Post-Bid
Canton, MA

Seekonk High School Domestic Hot Water Tank
Infrastructure
Post-Bid
$80,000 est. value
Seekonk, MA 02771

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Champion City Recovery - Rail Tarping Station Replacement
New Construction
Pending Verification
Brockton, MA 02301

Clean and Inspect Oil Water Separator 5200
Infrastructure
Bidding
Bourne, MA 02532

New Biofilter for EQ/Sludge Tank
Infrastructure
Post-Bid
Wareham, MA 02571

OWS Tank Cleaning Services
Results
Westfield, MA 01085

Water Storage Facility - Smith Neck Road Elevated Tank
Infrastructure
Post-Bid
$1,500,000 est. value
Dartmouth, MA

Waban Hill Reservoir Improvements
Results
Less than $900,000 est. value
Newton, MA

Water Filter Plant Bulk Tank Installation
Infrastructure
Post-Bid
$15,000 est. value
Southbridge, MA

Cleaning and Coating 2 MG Concrete Water Storage Tank
Results
Less than $100,000 est. value
Sandwich, MA

Design Of Wetlands Restoration Flood Storage And Storm Water Improvements
Infrastructure
Post-Bid
Woburn, MA

Last Updated 05/19/2022 11:16 PM
Project Title

Berkshire Towers Hot Water Tank Replacement Project at the Massachusetts College of Liberal Arts - Sub Bids

Physical Address View project details and contacts
City, State (County) North Adams, MA 01247   (Berkshire County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the existing Hot Water Tank located in the mechanical room of Berkshire Towers.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents