Similar Projects
Light Pole Fixtures
Term Contract
Post-Bid
La Crosse, WI

Exterior Bus Stop Signs
Post-Bid
Appleton, WI

Dump Station Reconfiguration/Relocation GPC
Renovation
Results
Kansasville, WI

Sunny Slope Road and Grange Avenue
Results
$1,949,105 est. value
New Berlin, WI 53146

Traffic Safety Improvements
Infrastructure
Post-Bid
Milwaukee, WI

Appleton Avenue (STH 175) and Woosencraft Way Traffic Signal Replacement and Intersection Improvements
Results
Less than $280,000 est. value
Menomonee Falls, WI 53051

Cable - Traffic Signal
Infrastructure
Post-Bid
Milwaukee, WI

CTH N & Evergreen Drive Traffic Signal Installation
Results
Kaukauna, WI 54130

Traffic Signal Led Modules
Infrastructure
Post-Bid

Traffic Signal Improvements - 16th Street and Lathrop
Infrastructure
Results
$150,000 to $200,000 est. value
Racine, WI 53400

Work Zone Traffic Control Items
Infrastructure
Post-Bid

Traffic Calming and Arterial Pedestrian Enhancements - 2021
Infrastructure
Results
$370,000 est. value
Madison, WI

Audible Pedestrian Equipment
Term Contract
Results
Milwaukee, WI

Aberg Avenue and NB Packers Avenue Ramp Traffic Signal
Infrastructure
Results
$147,381 est. value
Madison, WI

STH 11, IH 94 - Ohio Street; STH 20, IH 94 - STH 31
Infrastructure
Results
$40,000 est. value
WI

Reported 03/16/2022 12:00 AM
Project Title

Automatic Traffic Recorder (ATR) Station Installation and Maintenance Statewide

Physical Address View project details and contacts
City, State (County) State-Wide: WI
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Establish a contract for the purchase of automatic traffic recorder (ATR) station installation and maintenance statewide. This work will consist of removing failed piezoelectric axle sensors and quartz sensors from the pavement, installing new piezoelectric axle sensors and quartz sensors, and pulling the cables to the cabinet. It will also include installing inductance loops, pulling loop wires to a pull box and splicing them to lead-in cables, removing and replacing damaged lead-in cables between the pull box and the cabinet and patching holes in the pavement near sensors. Additional work may include installing type 10 concrete control cabinet bases, transformer bases and signal cabinets at new ATR stations. It will also include installing the following equipment outside of the roadway The Infrared Traffic Logger (TIRTL), as well as Wavetronix units.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents