Similar Projects
Interchange Improvements, Interstate 495 (NB and SB)at Interstate 90 (EB and WB)
New Construction, Infrastructure
Bidding
$339,185,106 est. value
Westborough, MA 01581

Structural Repairs and Related Work (Including Painting) On 4 Bridges Along Interstate 90
New Construction, Infrastructure
Bidding
$5,142,006 est. value
Brimfield, Warren, West Springfield, Westfield, MA

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Brookfield Road Over Cady Brook Bridge
Post-Bid
$651,500 est. value
Charlton, MA

Old South St. Bridge Repairs, Westville Lake, Sturbridge, MA
Results
$100,000 to $250,000 est. value
Sturbridge, MA

Bridge Rehabilitation - Elm Street Over Quick Stream Overflow
Results
$400,000 est. value
Blackstone, MA 01504

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
New Construction, Infrastructure
Bidding
$2,086,105 est. value

Old Mill Road Over Bowers Brook Bridge Rehabilitation
Infrastructure
Post-Bid
$150,000 est. value
Harvard, MA

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Results
Less than $1,515,000 est. value

Reconstruction of Toblin Hill Drive Bridge S-14-026
New Construction, Infrastructure
Bidding
$1,400,000 est. value
Shrewsbury, MA 01545

Scheduled and Emergency Bridge Repairs at Various Locations on Interstate 90
New Construction, Infrastructure
Post-Bid
$2,112,515 est. value

Bridge Replacement BR No (Steel) Fruit Street Over CSX Railroad and the Sudbury River
Results
Less than $12,580,805 est. value
Hopkinton, Westborough, MA 01748

Scheduled and Emergency Bridge Substructure Repairs and Related Work at Various Locations
New Construction, Infrastructure
Bidding
$1,522,078 est. value

Leino Park Bridge Replacement
New Construction, Infrastructure
Post-Bid
Westminster, MA 01473

Bridge Superstructure Replacement and Related Work BR No A-17-046 (Steel) I-90 Interchange 10 Over Route 12 (Southbridge Street)
Results
Less than $8,276,919 est. value
Auburn, MA 01501

Reported 02/10/2022 12:00 AM
Project Title

Roadway Reconstruction and Related Work

Physical Address View project details and contacts
City, State (County) Charlton, MA   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $63,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway Reconstruction and Related Work (Including Replacement of Bridge Nos. C-06-023 & O-06-002 on a Section of Route 20.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents