Similar Projects
Summit Street Water Storage Tank Painting - WS.28 - City of Brighton
Infrastructure
Conception
$775,000 CJ est. value
Brighton, MI 48116

Rehabilitation of Pine Creek Lift Stations - City of Brighton
Infrastructure
Conception
$517,000 CJ est. value
Brighton, MI 48116

Catholic Healthcare International Church / Padre Pio
New Construction, Infrastructure - 6,090 SF
Design
$1,200,000 CJ est. value
Howell, MI 48843

St Joseph Mercy - Brighton Expansion & Renovations / Trinity Health
New Construction, Renovation, Infrastructure - 209,326 SF
Design
$238,200,000 CJ est. value
Brighton, MI 48114

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Main Street Streetscape
Infrastructure
Bidding
$4,573,700 CJ est. value
Brighton, MI 48116

Fowlerville Community Schools New K-2 Building Project
New Construction, Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Fowlerville, MI 48836

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Three-Way Valve
Infrastructure
Post-Bid
MI

Interior Steam Renovations and Site Improvements
Renovation, Infrastructure
Results
Brighton, MI 48116

Riddle Street Water Main Replacement
Infrastructure
Results
$479,255 CJ est. value
Howell, MI 48843

U-M Health Brighton Center for Specialty Care Linear Accelerator Expansion
Addition, Infrastructure - 2,200 SF
Construction
$750,000 CJ est. value
Brighton, MI 48116

Howell Storage Marion D19 Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Howell, MI 48843

Brighton Cove Apartments Sanitary Pump Station Replacement
Infrastructure
Pending Verification
$200,000 CJ est. value
Brighton, MI 48116

AutoZone #5732 / Fowlerville
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Fowlerville, MI 48836

Last Updated 12/30/2022 11:38 AM
Project Title

East Grand River Water Main Improvements

Physical Address View project details and contacts
City, State (County) Howell, MI 48843   (Livingston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2022
Bids Due View project details and contacts
Estimated Value $2,599,147 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 30, 2022, the project has not been awarded. A timeline for award has not been confirmed. The contract will consist furnishing of labor, materials, equipment, and construction of the following: 1. Horizontally Directionally Drilled HDPE Water Main 2. Ductile Iron Water Main 3. Water Main Services 4. Lead Service Line Replacements 5. Sidewalk Removal and Installation Question Acceptance Deadline 01/14/2022 04:00 PM EST Questions are submitted online No General Requirements - Bid Deposit Required - Insurance Required - Installation Required - Prevailing Wage Required - Certified Payroll Questions, comments, or concerns of any bidder regarding bidding or the contract documents must be submitted in writing by the end of the day on January 14, 2022. No inquiry received after that date will be given consideration. Submit all questions to Engineer

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents