Similar Projects
Vacant Unit Reconditioning
Post-Bid
Trenton, NJ 08638

RFQ - HVAC Contractors
Post-Bid
Trenton, NJ

HVAC Upgrade at OT/PT Classroom - Maurice Hawk Elementary School
Results
Less than $110,000 est. value
Princeton Junction, NJ 08550

HVAC Upgrades at Johnson Park School
Results
$1,676,600 est. value
Princeton, NJ 08540

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Repairs and Maintenance
Results
Hamilton, NJ 08690

Upgrade of D-Site HVAC Systems
Post-Bid
$4,000,000 to $6,000,000 est. value
Princeton, NJ

Removal and Replacement of the HVAC System In the Mill Hill Playhouse
Results
Trenton, NJ 08611

Request for Qualifications for HVAC Services
Term Contract
Post-Bid
NJ

Trenton Central High School Boiler House Alteration
Results
Trenton, NJ 08609

Hydrogen Peroxide Air Filtration & Disinfection Products
Post-Bid

Controls and HVAC Improvements to Ewing High School and Fisher Middle School/ Ryan Building
Results
Less than $5,650,000 est. value
Ewing Township, NJ 08618

Weatherization Energy Conservation Project 2021-2022
Post-Bid

HVAC Controls Upgrade, Building 8
Results
$250,000 to $500,000 est. value
Lawrenceville, NJ

Installation of 11 low voltage UV sanitizing modules in existing HVAC equipment
Alteration
Post-Bid

Last Updated 01/13/2022 12:36 PM
Project Title

HVAC Upgrades at Stony Brook Elementary School

Physical Address View project details and contacts
City, State (County) Pennington, NJ 08534   (Mercer County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of but is not limited to the following: 1. Provide and install new insulated / insulated extension ducts behind the existing 42" diameter louvers which are temporarily removed and reinstalled after the required work. 2. Provide and install gravity intakes on the existing roof system, where indicated on the drawings. 3. Provide and install the required modifications / repair work the existing fiberglass asphalt shingle roof system as a result of the new construction work. 4. All other mechanical and electrical system work, as indicated on the drawings. 5. All other indicated work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents