Similar Projects
Food Service Equipment and Installation
Post-Bid
Battle Creek, MI

Battle Creek Montessori - Flexible Plan Classroom
Renovation
Post-Bid
Springfield, MI 49037

BP 5: Summer 2021 Renovations
Renovation
Results
Bedford, MI

Walk Thru Metal Detectors (WTMD)
Results

Snow Blower, Heavy Duty, Wheel Loader Attachment
Alteration
Post-Bid

One Time Purchase of Led Lamps
Alteration
Results
Clinton Township, MI 48035

56--127Th LRS Mezzanine Railing System
Term Contract
Post-Bid

High School - Fire Alarm Replacement
Renovation
Results
Battle Creek, MI

65--Mobile Lactation Station Suite
Term Contract
Post-Bid
Battle Creek, MI 49037

69--Battle Creek ANGB Audio Visual Update
Term Contract
Post-Bid
Battle Creek, MI

56--Rail System for Hangar 7 Mezzanine
Term Contract
Post-Bid

High School and Elementary Improvements
Renovation
Post-Bid
Battle Creek, MI

2021 Series 1 Bond
Renovation
Post-Bid
Battle Creek, MI 49015

Foundation for Behavioral Resources - Charter School
Renovation - 39,194 SF
Post-Bid
Battle Creek, MI 49014

2 Elem School Remote/Portable Classrooms
Renovation
Post-Bid

Last Updated 08/04/2022 03:10 PM
Project Title

2021 Bond Work - Pre-Purchase Package Springfield Middle School Northwestern Middle School

Physical Address View project details and contacts
City, State (County) Battle Creek, MI 49017   (Calhoun County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Equipment, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Mechanical equipment pre-purchase package for both Middle School renovation projects. To include: VUV's, RTU's, AHU's and Electrical Gear packages. Equipment pre purchase for the projects will be required onsite NLT July of 2023 if at all possible. This equipment will be installed by future Mechanical & Electrical Contractors TBD in the summer of 2023- 2025. No Pre-Bid Meeting is scheduled at this time. All proposals shall be accompanied by a sworn and notarized statement disclosing any familial relationship (or lack of a relationship) that exists between the owner or any employee of the bidder and any member of Battle Creek Public Schools. The District shall not accept a bid that does not include a sworn and notarized disclosure statement The base bid shall be a lump sum amount, for the work as set forth in the bid documents. Bid bond or certified check of not less than 5% of the bid amount shall be submitted with bid and made payable to Battle Creek Public Schools. The Owner reserves the right to accept or reject any and all bids, alternates, or proposals, and to accept bids, alternates, or proposals that, in its sole judgment, serve its best interests

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Humidity Control Equipment, Mechanical Dehumidification Units.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Switchgear, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents