Similar Projects
Chiller Maintenance Services
Infrastructure
Design
Detroit, MI 48201

Building SP HVAC Upgrades
Alteration
Post-Bid
Warren, MI

DWSD Air Handling Units and Associated Mechanical Equipment
Alteration
Post-Bid
Detroit, MI

Lincoln Middle School IT Server Room 2022 HVAC Upgrades
Alteration
Results
Warren, MI 48089

Stevenson High School PAC AHU Upgrade
Alteration
Results
Sterling Heights, MI 48313

UCS Bid Elementary RTU Additions
Alteration
Post-Bid
Sterling Heights, MI

IT Room HVAC Upgrades
Alteration
Results
Warren, MI 48089

Ahu Filter Replacements
Alteration
Post-Bid
Utica, MI

Air Filters
Alteration
Results
Sterling Heights, MI

CN Data Center Cooling
Alteration
Post-Bid
Clinton Township, MI

2022 Ventilation Equipment Package
Alteration
Results
Warren, MI 48089

HVAC Service Contract
Alteration
Post-Bid
Detroit, MI

HVAC Upgrades
Alteration
Results
Warren, MI

Fire Station Duct Cleanings
Alteration
Post-Bid
Clinton Township, MI 48038

Fraser Municipal Complex - Rooftop Unit (RTU) Replacement
Renovation
Results
$376,226 CJ est. value
Fraser, MI 48026

Last Updated 05/08/2023 08:37 AM
Project Title

Macomb Correctional Facility Boiler Replacement - Phase 2

Physical Address View project details and contacts
City, State (County) Lenox, MI 48048   (Macomb County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,662,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish existing domestic water heaters and domestic water storage tanks and install new in Housing Units HU1, HU2, HU4, HU5, HU6 and Building 100. 2. Demolish two existing domestic water heaters and one domestic water storage tank and install new in Housing Units HU3 and HU7. 3. Demolish existing boilers and install new in Housing Units HU3, HU5, HU6 and HU7. 4. Demolish two existing boilers and install new in Buildings 100 and 200. 5. Demolish existing and install new circulation pump in Housing Units HU1, HU2, HU3, HU4, HU5 and HU6. 6. Provide new boiler breeching, heating hot water piping, mixing valves, gas piping, piping components and all associated accessories. 7. Provide new controls for new boilers and water heaters and connect to existing controls to remain. 8. Rework existing roof curb penetration as required to accommodate new breeching thru roof. 9. Provide electrical modifications as required to accommodate boiler replacement. 10. Refer to plans and specifications for additional project scope requirements 5% Bid Security: Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to John L. Berbiglia at jberbiglia@berbigliaassoc.com no later than 2:00 p.m., Eastern on February 14, 2023 at 2:00 p.m.. Last date to ask questions is postponed to March 13th, 2023, 2:00 PM

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents