Similar Projects
Service Street
New Construction, Infrastructure
Conception
Thornton, CO

Owners Rep for New Construction/Cap Improvements
Design
CO

Reunion Commercial Center Filing 1 District
Infrastructure
Bidding
Commerce City, CO 80022

I-76 Combined Projectes for Reconstruction of Roadway and Replacing Bridges
New Construction, Infrastructure
Bidding
$20,000,000 est. value
CO

Design-Build Services I-70/Picadilly Interchange
Post-Bid
$37,000,000 to $43,000,000 est. value
Aurora, CO 80012

Concrete Replacement Program
Post-Bid
Thornton, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Aurora Municipal Center Plazas - Concrete Stabilization
Results
$500,000 to $600,000 est. value
Aurora, CO 80012

2022 Residential Streets Program
Infrastructure
Bidding
Northglenn, CO 80241

Sport Court Resurfacing
Term Contract
Post-Bid
Thornton, CO

Brighton Road from East 104th Avenue to East 112th Avenue
Results
Commerce City, CO 80022

2022 Arpa Streets
Infrastructure
Bidding
Northglenn, CO

Naval Facilities Engineering Systems Command Southwest Facilities Support Multiple Award Service Contract (Masc) at Various Locations In Arizona, California, Colorado, Nevada, New Mexico & Utah
Post-Bid

2020 Concrete Pavement Preservation Program
Term Contract
Results
$1,500,000 to $1,600,000 est. value
Aurora, CO

Taxiway A,B,C and E Lighting Construction and Taxiway C Rehabilitation Project
Infrastructure
Bidding
Watkins, CO 80137

Last Updated 02/22/2022 10:36 AM
Project Title

General Civil Construction Services

Physical Address View project details and contacts
City, State (County) Thornton, CO   (Adams County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Paving/Reconstruction, Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide construction related Services on an on-call, as-needed basis under a five (5) year General Service Agreement. Thornton intends to award to multiple Service Providers. Nothing herein guarantees any minimum amount of work to any Service Provider. Thornton requires one or more firms to perform construction Services such as: General civil construction, water line installation or repair, sewer line installation or repair, irrigation ditch work, stream or culvert cleaning and/or rehabilitation, grading, earthwork, riprap installation, concrete structure repair, fencing and guard-rail, sound barriers, retaining walls, underground location services, pipe boring and micro-tunneling, general water treatment plant process equipment services, reservoir dewatering, reservoir repairs, reservoir leak testing, general painting services, bridge painting, bridge painting/repairs, installation and maintenance of stormwater control measures and provide as-needed hydraulic modeling Services of Thornton’s existing and proposed water and wastewater systems, and other construction related Services that would benefit Thornton.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents