Similar Projects
Shawsheen Pump Station - DPW-23 - Town of Andover
Renovation
Conception
$1,574,350 est. value
Andover, MA 01810

Shawsheen Pump Station Upgrades (SEB) - DPW-32
Renovation
Conception
$4,000,000 est. value
Andover, MA 01810

Middle Fort Pond Brook WWTF Rehabilitation
Renovation
Bidding
$4,000,000 est. value
Acton, MA

Narrows Pump Station Force Main Lining
Renovation
Bidding
$240,000 est. value
Wareham, MA 02571

Emergency Water System Interconnection between Attleboro and Pawtucket
Post-Bid
$2,700,000 est. value
Attleboro, MA 02703

Construct New West Peabody Pump Station - Sub Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Surfside Roads Area Sewer System Improvements
New Construction
Results
Nantucket, MA 02554

Well Pumping Station 1 Rehabilitation, Treatment Building 3 and Appurtenant Work - General Bids
Renovation
Results
Less than $1,350,000 est. value
Barnstable, MA 02630

Vineyard Wind 2 Route and Mother's Park Pump Station - Town of Barnstable
New Construction
Conception
$28,000,000 est. value
Barnstable, MA

Primary Service Upgrade Project
Renovation
Bidding
$2,000,000 est. value
Boston, MA

Construct New West Peabody Pump Station - General Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Marlborough Standby Water Pump Station
New Construction
Results
$1,787,000 est. value
Marlborough, MA 01752

Wastewater Pump Station Upgrades - General Bids
Post-Bid
$3,640,000 est. value
Great Barrington, MA 01230

Greensand Filtration Facility for Well No. 5 - General Bids
Results
$8,000,000 est. value
Holliston, MA 01746

Howe Avenue Pump Station Upgrade - General Bids
Post-Bid
$390,000 est. value
Shrewsbury, MA 01545

Reported 06/29/2022 04:52 PM
Project Title

Fish Brook Intake Replacement - DPW-29 - Town of Andover

Physical Address View project details and contacts
City, State (County) Andover, MA 01810   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value Less than $10,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and permitting for new Fish Brook Pump Station intake to Merrimac River. This project is included in the town's FY 2022-2026 Capital Improvement Program. As of June 29, 2022, further details regarding design and construction timelines have not been identified. FY2022 funds are requested for design, and FY2023 funds will be requested for the construction of a modern shock resistant running surface. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents