Similar Projects
Paving and Catch Basin Improvements at Family Development
Infrastructure
Bidding
$1,500,000 CJ est. value
Auburn, ME 04210

2022 Water Main Replacement
Infrastructure
Bidding
$848,000 CJ est. value
Lewiston, ME 04240

Retaining Wall Installation at Lake Auburn Towne House
Infrastructure
Sub-Bidding
$418,000 CJ est. value
Auburn, ME 04210

Fy21 R1 New England Electric Supply
Term Contract
Post-Bid

On Call Electrical Services - Region 3
Alteration
Post-Bid
Greene, ME

Statewide Geotechnical Drilling
Infrastructure
Results

Energy Savings Performance Contract and Solar PPA Services
Alteration
Results
Lewiston, ME

Residence at Great Falls
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Lewiston, ME 04240

Brickyard Commons - Auburn
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Auburn, ME 04210

Electric Procurement
Alteration
Post-Bid
Lewiston, ME

Canal Street Lighting
Alteration
Results
Lewiston, ME 04240

Auburn-Lewiston Municipal Airport Physical Access Control System
Renovation
Post-Bid
$100,000 CJ est. value
Auburn, ME 04210

New Outdoor Student Pavilion
Infrastructure
Results
$451,602 CJ est. value
Auburn, ME 04210

Mill, Main and Broad Streets Intersection and Corridor Improvements
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Auburn, ME 04210

Lead Abatement Project - 30 Academy Street
Term Contract, Infrastructure
Results
$84,000 CJ est. value
Auburn, ME 04210

Last Updated 08/12/2022 11:09 AM
Project Title

East Avenue & Lisbon Street Traffic Signal Upgrades

Physical Address View project details and contacts
City, State (County) Lewiston, ME 04240   (Androscoggin County)
Category(s) Heavy and Highway, Outdoor Lighting, Single Trades
Sub-Category(s) Electric, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $633,950 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the EAST AVENUE & LISBON STREET TRAFFIC SIGNAL UPGRADES shall consist of, but not be limited to, the complete and satisfactory construction of Traffic Signal Improvements at seven intersections, installation of approximately 8,000 linear feet of fiber optic cable interconnect, and all other incidental work as necessary to satisfactorily complete the project as outlined or implied in the Plans/Specifications. No Proposal will be considered unless it is accompanied by a bid security in the form of a bid bond or certified check in the amount of five percent (5%) of the total bid price, made out in favor of the City of Lewiston. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated. A Performance Bond and a Labor and Material Payment Bond, preferably executed on AIA Bond Form Number A311, in an amount equal to the total Contract price, of a surety company satisfactory to the Purchasing Agent, will be required of the successful bidder to ensure completion of the work and the proper fulfillment of the conditions of the Contract. The total Contract price shall mean the total bid price as stated in the Proposal based on the estimated quantities of the various items of work.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents