Similar Projects
Costco / Longmont
New Construction, Infrastructure - 150,000 SF
Conception
$12,000,000 CJ est. value
Longmont, CO 80501

Murphy Express #8635 / Louisville
New Construction, Infrastructure - 2,800 SF
Design
$2,500,000 CJ est. value
Louisville, CO 80027

The Ridgeway Science & Tech
New Construction, Infrastructure - 112,000 SF
Design
$65,000,000 CJ est. value
Boulder, CO 80301

North Drive Drainage Improvements - Lyons Middle/Senior High School
Infrastructure
Bidding
$200,000 CJ est. value
Lyons, CO 80540

RFQ Construction Manager - Little Thompson River Trail Project
Infrastructure
Bidding
$200,000 CJ est. value
Longmont, CO 80503

RFQ Contractor - Tunnel Construction Subcontractor
Infrastructure
Sub-Bidding
$9,500,000 CJ est. value
Boulder, CO 80302

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Willoughby Corner - CB1 & Senior Building
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Lafayette, CO 80026

Southlands-Linear Park Phase 2-160th Avenue-Sheridan Parkway Phase 2 Grading
Infrastructure
Results
$5,162,008 est. value
Broomfield, CO

Southlands Public Infrastructure Improvements
Infrastructure
Results
$10,741,205 CJ est. value
Broomfield, CO 80023

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Main Street Hotel / Lyons
New Construction, Infrastructure - 50,000 SF
Pending Verification
$15,000,000 CJ est. value
Lyons, CO 80540

Saddle Creek
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Boulder, CO 80302

Quail Commercial Center
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Longmont, CO 80503

RFP Construction Manager - Potts Field and Prentup
Infrastructure
Bidding
$5,500,000 CJ est. value
Boulder, CO 80303

Last Updated 10/13/2022 12:02 PM
Project Title

RFP Construction Manager - Residence One

Physical Address View project details and contacts
City, State (County) Boulder, CO 80302   (Boulder County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Dormitory, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Request for Qualifications, Construction start expected September 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $91,700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 13, 2022, a construction manager has not been awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to September 2023. *The closed solicitation has been included below for reference: The Regents of the University of Colorado Boulder are seeking a General Contractor for services and requests submittal for proposals of General Contractors for the project titled UCB000393-Residence One. 1. This project will construct a new 175,000-190,000 gross square foot multi-story Student Residence building in the North of Boulder Creek University neighborhood. The building will contain the following elements, 400 beds in apartment studio, one bedroom, two bedroom, and four bedroom style dwelling units, a retail/cafe food service area, student gathering spaces, and building support spaces. The site work will include utility work landscape, and hard scape. Project completion will be May of 2025. The GC will need to coordinate with a sustainability Consultant during design and construction. The project will be a minimum LEED Gold project. Please reference the attached Program Plan, the site shown in the program plan has shifted to the east, refer to the attached map from the Master Plan. Residence One will now be on sites 6 & 5. This site is approximately 80,000 square feet. Per State of Colorado law C.R.S. 24-92 Part 2,which includes Direct Labor Burden Calculation (SBP-6.18), Applicable Prevailing Wage Rates and Apprenticeship Utilization Certifications (SBP-6.17), this project was approved prior to the implementation of the law and will not be required to meet Prevailing Wage or Apprenticeship Utilization Certifications or to utilize LCP Tracker during the project. Direct Labor Burden Calculation are still required. The University of Colorado Boulder anticipates using a Construction Manager/General Contractor (CM/GC) approach to project delivery. A Guaranteed Maximum Price (GMP) and an updated project duration schedule will be established by the Architect/Engineer and the Construction Manager/General Contractor in conjunction with the University of Colorado Boulder. The CM/GC will evaluate, among other things, availability of materials and labor, project schedule, project costs as they relate to the established budget, constructability, and will work closely with the Architect/Engineer and the University of Colorado Boulder throughout the planning, design and construction phases of the project. Construction is estimated to commence September 2023. The process to be used in the selection of the CM/GC is comprised of two steps. STEP I is the Submittal of Prequalification as described in Section II (D). STEP II is the Oral Interview/Cost Proposal as described in detail in Section III. A Jury Panel of individuals who will be involved in the project and/or understand the required services associated with Construction Management/General Contracting will evaluate responses to this RFP for both IPD CM/GC RFP Page 2 Rev 7/2021 STEPS. Upon completion of the evaluation of the Submittals of Prequalification, a limited number of firms will be invited to the oral interviews. Sealed fee proposals will be required only from those firms who are interviewed and are to be submitted as indicated in this RFP. Both qualifications and cost will be considered in the final ranking of firms with qualifications given 70% of the value of the weighted criteria and fees for the Cost/ Proposal given 30% A. SCHEDULE 1. The schedule of events for the RFP process and an outline of the schedule for the balance of the project is as follows: Date Email Questions Due 09/22/2022 Date Email Answers Issued 09/26/2022 Interview Short List Announced 10/13/2022 Interview Short List Announced 10/13/2022 Sealed Proposal Due (Evaluation and Award: Step II) 10/27/2022 Oral Interviews 10/31/2022 - 11/02/2022 Selection Announced 11/03/2022 Negotiation of CM/GC Contract NA Contract Approval (projected) 12/02/2022 Anticipated Design Start 08/26/2022 Anticipated CM/GC Start 12/02/2022 Anticipated Construction Start/Finish Sept. 2023-May 2025

Details

190,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents