Similar Projects
Z--Zion 274111 - Bridge Preservation, Zion National Park
Design
$1,000,000 to $5,000,000 est. value
Springdale, UT 84767

SR-154 Over 3600 W Deck Preservation (0C-815)
Bidding
$500,000 to $1,500,000 est. value
UT

FA-2234; Magna Bridge Replacments, 035031F 035033F
Post-Bid
$500,000 to $1,500,000 est. value
UT

Little Valley Road Bridge Replacement Project
Post-Bid
Heber, UT 84032

Mud Creek and Winter Quarters Creek Road and Bridge Abutment Construction Project
Results
Price, UT

US-191; North Moab to Colorado River Bridge
Results
$15,000,000 to $20,000,000 est. value
UT

River Bridge Event Center
New Construction - 7,615 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Spanish Fork, UT

Bridge Deck Repair on I-15
Post-Bid
Cedar City, UT 84720

Red Butte Garden Upper Creekside Walk Bridges Trail
Results
Less than $1,068,315 est. value
Salt Lake City, UT 84108

Recapture Creek Bridge - 037004C
Post-Bid
$500,000 to $1,500,000 est. value
UT

Foothill VMS; Southbound Traveler Information
Results
Less than $500,000 est. value
UT

Mcelmo Creek Bridge - 037012C
Post-Bid
$1,500,000 to $3,000,000 est. value
UT

State Street Pedestrian Bridge Removal
Results
Murray, UT 84107

West Cache Canal Screening Project
Post-Bid

DFCM Construction-DWR WMAS Statewide Bridge Repairs
Results
Less than $375,000 est. value
Ogden, UT

Last Updated 12/10/2019 04:59 PM
Project Title

Construction of Two (2) Bridges

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84720   (Iron County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this project shall consist of furnishing all labor, equipment, and materials for the construction of two (2) bridges designed and paid for by the Dixie National Forest. The new bridges will replace older structures in the First and Second Left Hand canyons, each near State Hwy 143 in Parowan Canyon.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents