Similar Projects
Post Road Apartments
Renovation - 150,000 SF
Conception
$15,000,000 est. value
Warwick, RI 02886

East Greenwich Luxury Estates
Demolition, New Construction, Infrastructure
Conception
$7,800,000 CJ est. value
West Warwick, RI 02893

Centerville Road Condominium
New Construction
Design
Warwick, RI 02886

Waterside @ Little Pond
New Construction
Design
Warwick, RI 02889

Cedar Swamp Force Main Rehabilitation
Infrastructure
Bidding
$2,000,000 CJ est. value
Warwick, RI 02889

Asphalt Pavement Improvements
Infrastructure
Post-Bid
Coventry, RI

Site Improvements at Shawomet Terrace
Infrastructure
Post-Bid
Warwick, RI 02889

Road Rehabilitation Services Various Roads, Reclamation
Infrastructure
Results
$4,000,000 to $4,500,000 est. value
West Warwick, RI

Exchange Street Apartments
New Construction, Demolition - 20,473 SF
Construction
$950,000 est. value
East Greenwich, RI 02818

Brookside Terrace
New Construction
Construction
$10,000,000 est. value
East Greenwich, RI 02818

Woodsprings Suites - Post Road / Warwick
New Construction, Infrastructure
Pending Verification
$30,400,000 CJ est. value
Warwick, RI 02886

Woodsprings Suites - Post Road / Warwick
New Construction, Infrastructure
Pending Verification
$30,400,000 CJ est. value
Warwick, RI 02886

Williams Street Multifamily Development
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Warwick, RI 02889

Woods At Red Brook
New Construction
Design
Coventry, RI

Crack Seal and Micro Surfacing
Infrastructure
Post-Bid
Warwick, RI

Last Updated 10/26/2022 09:09 AM
Project Title

Kilvert Street Multi Residential Development

Physical Address View project details and contacts
City, State (County) Warwick, RI 02889   (Kent County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $90,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope details have not been released. As of October 26, 2022, construction of the multi-family residences has not begun. A general contractor has been identified. A new street is being created for the multi-residential development on Golden Grove way but intersects with Kilvert Street, and will be along or near Graystone Street, Cottage Street, Dorrance Street, Marvin Street, and Metro Center Boulevard. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to first quarter 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents