Similar Projects
Boilers Replacement Building C And D
Bidding
Marietta, GA 30060

LK Moss HVAC Replacement
Bidding
Buena Vista, GA 31803

HVAC Coil Cleaning
Post-Bid
Atlanta, GA

HVAC Maintenance and Repair Services
Post-Bid
Atlanta, GA 30303

HVAC Service to Include Repair and Maintenance
Term Contract
Results
Powder Springs, GA 30127

Shallowford Falls Elementary School Kitchen Hood and HVAC Renovations
Results
Less than $303,000 est. value
Marietta, GA 30062

Kitchen HVAC Renovations
Post-Bid
Sandy Plains, GA 30075

Addison Elementary Energy Recovery Unit
Addition
Results
Less than $36,388 est. value
Kennesaw, GA 30152

Hydraulic Cylinder, Components, Pump Repairs, Hose Fabrication
Post-Bid
Atlanta, GA

Addison Elementary VRF Heat Recovery System
Results
Less than $33,370 est. value
Kennesaw, GA 30152

HVAC Filtration Systems Upgrades
Post-Bid
Austell, GA 30106

Addison Elementary Rooftop Units
Results
Less than $81,715 est. value
Kennesaw, GA 30152

HVAC and Mechanical Products
Term Contract
Post-Bid

Addison Elementary School HVAC Renovations 2020
Results
Less than $1,005,000 est. value
Marietta, GA 30066

Chiller and Cooling Tower Maintenance Service
Term Contract
Post-Bid
Marietta, GA 30060

Last Updated 06/24/2020 04:54 PM
Project Title

Lassiter/Sprayberry HS HVAC Improvement Chiller Replacement

Physical Address View project details and contacts
City, State (County) Marietta, GA 30060   (Cobb County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,479,935
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

At Lassiter HS; Remove & replace two(2) existing chillers with two(2) new 205 ton air cooled chillers in expanded mechanical yard. Demo two cooling towers and associated devices to make room for new chillers. Underground piping, main building pumps may be reused & power tapped from existing yard transformers. At Sprayberry HS; Remove & replace two(2) existing chillers with two (2) new 250 ton air cooled chillers in new mechanical yard. Cap existing cooling tower lines. Addition al retaining wall & storm water work & gas piping modifications.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents