Similar Projects
Last Updated | 12/02/2020 11:34 AM |
Project Title | Collection System Rehabilitation – 2019 |
Physical Address | View project details and contacts |
City, State (County) | OH (Clermont County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $518,683 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work under this Project is generally defined as the rehabilitation of approximately 1,405 LF of gravity sewer using cured-in-place pipe on 8-inch diameter sewer main, approximately 1,196 LF of gravity sewer using cured-in-place on 12-inch diameter sewer main; reinstatement and rehabilitation of approximately seven (7) 6-inch diameter sewer laterals using curred-in-place lining; rehabilitation of approximately fourteen (14) 4-foot diameter manholes, including application of approximately 190 VF of polymeric coating, replacement of approximately 100 LF of 8-inch PVC gravity sewer main and replacement of one (1) 4-foot diameter sewer manhole. This work will take place in an existing 20’ sewer easement located along the rear of Boyd E. Smith Elementary School and residential properties from David Court to Cook Road in Miami Township. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |