Similar Projects
Dollar General
New Construction - 10,948 SF
Conception
$750,000 est. value
Bentonville, AR 72712

Innovation Center
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Paragould, AR 72450

Walmart Supercenter #144-244 - SMART BUNDLE
Renovation - 217,969 SF
Design
Fayetteville, AR 72704

AutoZone #3634
New Construction
Design
Van Buren, AR 72956

Sam's Club #8134-606 - CAPXSUS-AHU
Renovation
Post-Bid
Fort Smith, AR 72903

Walmart Supercenter #141-254 - CSP
Renovation - 200,084 SF
Post-Bid
Fort Smith, AR

Walmart Supercenter #125-245 - Entertainment Optimization
Renovation - 22,413 SF
Construction
Fort Smith, AR 72901

Walmart Neighborhood Market #2741-223 - CSP
Renovation - 40,257 SF
Construction
$74,358 est. value
Bentonville, AR 72712

Midwest Equipment
Build-Out
Pending Verification
Bentonville, AR 72712

Rogers Marine Sales, Rentals & Service
New Construction - 15,000 SF
Pending Verification
Rogers, AR 72756

U-Haul Leasing and Towing
Renovation
Conception
Lowell, AR 72745

AutoZone #5023
New Construction
Design
Tontitown, AR 72762

Walmart Supercenter #229-605 - CAPXHVAC-2
Renovation
Post-Bid
Trumann, AR

Walmart Neighborhood Market #6953-225 - CSP
Renovation - 41,117 SF
Construction
Less than $88,825 est. value
Centerton, AR 72712

Rogers Warehouse Development
New Construction
Pending Verification
Springdale, AR

Last Updated 07/25/2022 12:32 AM
Project Title

Walmart Supercenter #348-278 - Construction Special Project / Monticello

Physical Address View project details and contacts
City, State (County) Monticello, AR 71655   (Drew County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,101,346 [brand] Estimate
Plans Available from Not Specified
Owner View project details and contacts
Architect View project details and contacts
Description

This project has been awarded.* *Due to the direct relationship with Walmart, the only project contacts are the general contractors invited to bid. At this time Walmart works with a select group of pre-approved general contractors. Walmart is not accepting new general contractor qualifications at this time.

Details

1 Story Above Grade, 6,734 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents