Similar Projects
Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

Locust Street Mass Timber Apartment Building
New Construction, Infrastructure
Design
$110,000,000 CJ est. value
Saint Louis, MO 63103

Locust Street Mass Timber Apartment Building
New Construction, Infrastructure
Design
$110,000,000 CJ est. value
Saint Louis, MO 63103

Berry Box - Food Stall #19 / Saint Louis
New Construction, Infrastructure - 411 SF
Bidding
$3,000,000 CJ est. value
Saint Louis, MO 63110

Pump Station Fall Protection Upgrades - Phase I
Infrastructure
Bidding
$650,000 CJ est. value
Saint Louis, MO 63103

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Badenhaus Apartments Site Improvements
Infrastructure
Post-Bid
Saint Louis, MO 63147

Police Precinct 1 - St. Louis County - Rebid
New Construction, Infrastructure - 17,224 SF
Results
$9,526,000 CJ est. value
Saint Louis, MO 63103

Playground Safety Tiles
Term Contract
Results

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

The Flats at Forest Park
Demolition, New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saint Louis, MO 63108

The Flats at Forest Park
Demolition, New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saint Louis, MO 63108

Tower Grove Park - City of St. Louis
Infrastructure
Conception
$2,886,599 CJ est. value
Saint Louis, MO 63110

Last Updated 11/30/2022 03:31 AM
Project Title

Cherokee Street Love Bank Park Redevelopment

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63118   (Saint Louis City County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Site Development, Stadium
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of new construction of a permeable basketball court, a plaza with permeable pavers and planting areas, a small structure featuring a 127 square foot storage room, small outdoor stage, and utility access, and a 940 square foot shade structure. PLEASE NOTE: - The project has been awarded a rainscaping grant from the Metropolitan Sewer District and will need to comply with MSD requirements. - Please visit the site to assess conditions. - This project is NOT tax exempt. - This project IS prevailing wage, and certified payroll reporting is required. - Only the MSD-funded portion of this project (earthwork, drainage, soils, landscaping, pavers) is subject to prevailing wage and certified payroll reporting. - Certified Minority and Women Owned Business Enterprises and Section 3 Businesses are strongly encouraged to bid. - Bids should be based off notes in the drawings and specifications; however, while all notes regarding allowances should be reviewed, DO NOT include allowances in your bids. - All workers must be OSHA 10 certified. - E.M. Harris Construction is an Equal Opportunity Employer.

Details

1 Story Above Grade, 1,067 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Playground Equipment, Play Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Grading, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents