Similar Projects
El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

Ac Water Group 1027A - City Of San Diego
Alteration
Conception
$900,000 est. value
San Diego, CA 92101

Construct Rumble Strips on Both Shoulders, Rehabilitate Bike Path, and Install Fiber Optic Cable/closed Circuit Television (Cctv)
Infrastructure
Design
$7,535,000 CJ est. value
San Diego, CA 92101

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

Bermuda Avenue Coastal Access Replacement
Infrastructure
Bidding
$1,290,000 CJ est. value
San Diego, CA 92107

Storm Water Diversion at the South Bay Water Reclamation Plant
Demolition, New Construction, Infrastructure
Bidding
$2,940,000 CJ est. value
San Diego, CA 92154

Iowa Street
Demolition, New Construction, Infrastructure - 7,005 SF
Sub-Bidding
$4,526,000 CJ est. value
San Diego, CA 92104

Design of Otay 2nd Pipeline St Replacement Ph 5
Infrastructure
Post-Bid
$200,000 to $2,500,000 est. value
San Diego, CA 92101

Chilled Water System
Infrastructure
Post-Bid
San Diego, CA

Recycled Air/Vac & Drain Replacement Project
Alteration
Results
$50,000 est. value
Fallbrook, CA 92028

City of Poway Treated Water Facilities and Redundant Pipeline Project
Infrastructure
Results
$1,310,000 est. value
Poway, CA 92064

Oceanside Fire Station #1
Demolition, New Construction, Infrastructure
Construction
$13,579,000 CJ est. value
Oceanside, CA 92054

Nestor Field
Infrastructure
Construction
$122,124 CJ est. value
San Diego, CA 92154

TopGolf / Port of San Diego
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
San Diego, CA 92101

Chula Vista Bayfront Parks - Sweetwater Park
Infrastructure, Renovation
Pending Verification
$12,000,000 CJ est. value
Chula Vista, CA 91910

Last Updated 08/18/2022 10:16 AM
Project Title

Gordon Hill Road Pipeline Replacement Project

Physical Address View project details and contacts
City, State (County) Valley Center, CA 92082   (San Diego County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,384,649 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

NOVA Project 2021017 Bids received after this time will be returned unopened. Bids shall be valid for 60 calendar day(s) after the bid opening date Project Funding: Funding for this project has been provided in full or in part through an agreement with the State Water Resources Control Board. California Drinking Water State Revolving Fund("DWSRF")is capitalized through a variety of funding sources, including loans or grants from the United States Environmental Protection Agency("USEPA")and state bond proceeds. The contents of this document do not necessarily reflect the views and policies of the foregoing, nor does mention of trade names or commercial products constitute endorsement or recommendation for use.(Gov.Code7550,40CFR 31.20.) Bids must comply with all requirements associated with this funding source, including, but not limited to, USEPA DBE compliance and American Iron and Steel. In addition, the successful Bidder will be required to comply with all requirements associated with the DWSRF funding in carrying out the Project. The DWSRF funding requirements are described in Section 00800WSRF Fund in Requirements. The project generally consists of abandonment of existing 10-/12-inch buried steel potable waterline, water services and appurtenances on improved Gordon Hill Road (Private) and fenced back yards. Approximately 4,700 linear feet of 12-inch diameter buried polyvinyl chloride (PVC) potable waterline including valves, water services, appurtenances shall be installed within Gordon Hill Road (Private) and VCMWD Easements, between Old Castle Road (Public) and Welk View Drive (Private). Segments of existing pipeline in conflict with proposed waterline alignments shall be removed and disposed. Tie in connections are required within Old Castle Road, an existing developed County of San Diego public road and Welk View Drive (Private). All work in the contract shall be completed within Three Hundred Sixty-Five(365)calendar days of the date of the Notice to Proceed. Digital copies shall be made available only through Valley Center Municipal Water District offices. Bids must be submitted on the District's Bid Forms or copies thereof. Bids must be accompanied by cash, a certified or cashier's check, or a Bid Bond in favor of the District in an amount not less than ten percent (10%) of the submitted Total Bid Price. Each bid shall be accompanied by the security referred to in the Contract Documents, the Non-Collusion Declaration, the list of proposed subcontractors, and all additional documentation required by the Instructions to Bidders. The successful bidder will be required to furnish the District with a Performance Bond equal to 100% of the successful bid, and a Payment Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California. Pursuant to Public Contract Code Section 22300, the successful bidder may substitute certain securities for funds withheld by District to ensure his performance under the Contract. The Director of Industrial Relations has determined the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract which will be awarded to the successful bidder, copies of which are on file and will be made available to any interested party upon request at the Engineering office or online at portal. A copy of these rates shall be posted by the successful bidder at the job site. The successful bidder and all subcontractor(s) under him, shall comply with all applicable Labor Code provisions, which include, but are not limited to the payment of not less than the required prevailing rates to all workers employed by them in the execution of the Contract, the employment of apprentices, the hours of labor and the debarment of contractors and subcontractors. Pursuant to Labor Code sections 1725.5 and 1771.1,all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work. If awarded a Contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. In bidding on this project, it shall be the Bidder's sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this contract and applicable law in its bid. Since this Project is funded in whole or inpart with DWSRF funds, the work must also comply with the minimum rates for wages for laborers and mechanics as determined by the Secretary of Labor in accordance with the provisions of Davis-Bacon. As between the State and Federal rates, the higher of the two rates must be paid. Attention is directed to the DWSRF Funding Requirements section of the Contract Documents. Each bidder shall be a licensed contractor pursuant to the Business and Professions Code and shall be licensed in the following appropriate classification(s) of contractor's license(s), for the work bid upon, and must maintain the license(s) throughout the duration of the Contract: A-General Engineering or C-34, Pipeline. Award of Contract: The District shall award the Contract for the Project to the lowest responsible bidder as determined from the base bid alone by the District. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process. For further information, contact the District Engineering Department at (760)735-4500or Engineering_Projects@vcmwd.org. Bidders may examine the Contract Documents at the office of the Valley Center Municipal Water District, 29300 Valley Center Road, Valley Center, California 92082(Contact: Alberto Sandoval (760) 735-4577).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents