Similar Projects
Village of Oak Park Main Fire Station Bunk Room Renovations
Renovation
Sub-Bidding
$160,000 CJ est. value
Oak Park, IL 60301

Insulation Removal and Minor Demo
Demolition, Alteration
Post-Bid
Chicago, IL

Escalator Handrail and Field Splicing
Term Contract, Alteration
Post-Bid
Chicago, IL

Vivian Gordan Harsh Apartment Interior
Renovation, Alteration
Results
Chicago, IL 60653

METRA Station Retractable Wall Design and Installation
Alteration
Results
Oak Park, IL 60301

Willow Grove Ceiling Replacement
Alteration
Post-Bid
Buffalo Grove, IL

Niles West Science Wing Curtain Wall and Windows
Alteration
Results
Skokie, IL 60077

Whiteboard Removal, Wall Restoration and Painting Services
Alteration
Post-Bid
Prospect Heights, IL

2022 Curtain Wall Replacement
Alteration
Results
Mount Prospect, Rolling Meadows, IL 60056

Rhodes School District 84.5 Classroom Addition and Renovation
Addition, Demolition, Infrastructure, Renovation
Post-Bid
$1,408,300 CJ est. value
River Grove, IL 60171

CPS Von Steuben HS Boys Lockers
Alteration
Results
Chicago, IL 60625

New Custom Lockers
Alteration
Post-Bid
Wheeling, IL

Burley-Chase-ACD-03-22-2022-Only Pre-Qualified Various Trades Pool
Renovation
Results
$307,200 CJ est. value
Chicago, IL 60604

Program Consolidation Phase 1 - Casework Package
Alteration
Post-Bid
$200,000 est. value
Arlington Heights, IL 60005

Decatur ES Floor Shoring
Alteration
Results
Chicago, IL 60645

Last Updated 07/03/2023 01:40 PM
Project Title

CPS Sor Juana Old John Hancock College Prep

Physical Address View project details and contacts
City, State (County) Chicago, IL 60629   (Cook County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of Renovating classrooms and support spaces at Old Hancock HS to accommodate the relocation of Sor Juana ES and West Lawn (pre-k through grade 8) classrooms. The work includes conversion of classrooms and labs to Pre-K and Kindergartner classrooms, modifications to student bathrooms, and miscellaneous finish throughout. Trades included but not limited to: Selective Demo.,Cast-In-Place Concrete, Cast Underlayment, Unit Masonry, Single-Wythe Unit Masonry, Cold Formed Metal Framing, Rough & Finish Carpentry, Architectural Wood Casework, Firestopping, Joint Sealants, D/F/H, Flush Wood Doors, Access Doors & Panels, Glazing, Plaster Patching, Drywall, Tiling Renovations, Wood Athletic Flooring Renovations, Acoustical Ceilings, Lath, Gypsum Plaster, Tiling, Wood Athletic Flooring, Resilient Flooring, Renovation, Exterior & Interior Painting, Visual Displays, Signage, Toilet Compartments & Accessories, Gymnasium Equipment – ES, Playground Equipment, Manufactured Casework, Window Shades, Countertops, Plumbing, HVAC, Electrical, Communications, Grading, Earthwork, Excavation, Fill, Asphalt Paving, Asphalt Sealcoat, Concrete Paving, Playground Protective Surfacing, Site Furnishings, & Landscaping.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents