Similar Projects
Origin Hotel
New Construction
Design
Tulsa, OK

OSU Medical Research Secured Parking Lot
Demolition, Infrastructure
Post-Bid
Tulsa, OK 74136

Supplemental Architecture and Engineering Services for Oklahoma
Term Contract
Post-Bid

Arrivals Roadway Canopy Fabric Replacement
Alteration
Results
Tulsa, OK

Aspen Ridge Norfolk Drive
Infrastructure
Results
$2,984,324 est. value
Broken Arrow, OK 74011

Tulsa Technology Center Construction
Term Contract
Post-Bid
Tulsa, OK 74127

Cedar Springs Estates Concrete Roadway Panel Replacement with Additional Miscellaneous Concrete Work
Infrastructure, Alteration
Results
$1,115,000 est. value
Broken Arrow, OK

Owasso Sports Park - Parking Improvements
Infrastructure
Post-Bid
$200,000 est. value
Owasso, OK 74055

Southbrook Concrete Roadway Panel Replacement
Infrastructure, Alteration
Results
$1,800,000 est. value
Broken Arrow, OK

ADA Sidewalk at the Tulsa Community College Southeast Campus
Infrastructure
Post-Bid
$100,000 est. value
Tulsa, OK 74133

Pedestrian and Bike Improvements
Infrastructure
Results
OK

TCC West Campus - Walkway Conditioning
Infrastructure
Post-Bid
$400,000 est. value
Tulsa, OK 74107

23rd Street Sidewalk from Liberty Trail to 115th Street
Infrastructure
Results
$55,000 est. value
Broken Arrow, OK 74012

New Orleans Sidewalk Improvements Aspen to Elm
Infrastructure
Results
$600,000 est. value
Broken Arrow, OK 74011

Pedestrian Improvements (Protected Bike Lanes) City Streets (W 11th Street/W 12th Street)
Infrastructure
Results
OK

Last Updated 05/30/2022 04:50 AM
Project Title

Pedestrian Improvements (Trail Construction) Bixby East Fry Trail

Physical Address View project details and contacts
City, State (County) OK   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pedestrian Improvements (Trail Construction) Bixby East Fry Trail: From 131st Street, Extend North And East In The City Of Bixby. Project Length = 2.68 Miles Section 0001 - Roadway Line No. Item No. Description Quantity 0010 201(a)1200 Clearing And Grubbing 1.00 Lsum 0020 202(a)2200 Unclassified Excavation 1,477.00 Cy 0030 202(d)2500 Unclassified Borrow 692.00 Cy 0040 205(a)6200 Type a-Salvaged Topsoil 1.00 Lsum 0050 221(b)2300 Temporary Silt Fence 13,691.00 Lf 0060 227 4100 (Sp)Turf Reinforcement Mat 78.00 Sy 0070 230(a)7200 Solid Slab Sodding 7,799.00 Sy 0080 240(a)2200 Removing Trees 6" To 12" In Diameter 17.00 Ea 0090 303(a)1200 Aggregate Base Type a 1,906.00 Cy 0100 310(b)5300 Subgrade, Method b 11,579.00 Sy 0110 325 0100 Separator Fabric 14,700.00 Sy 0120 411(c)1430 Superpave, Type s4(Pg 64-22 Ok) 2,539.00 Ton 0130 509(a)0200 Class Aa Concrete 391.00 Cy 0140 509(d)0500 Class c Concrete 73.00 Cy 0150 510(a)1200 Retaining Wall 214.00 Sy 0160 510(c)1400 Slope Wall 157.00 Sy 0170 511(a)2200 Reinforcing Steel 7,584.00 Lb 0180 601(b)1200 Type i Plain Riprap With Filter Blanket 25.00 Ton 0190 609(b)4310 Combined Curb & Gutter(6" Barrier) 50.00 Lf 0200 610(a)5200 4" Concrete Sidewalk 349.00 Sy 0210 610(b)5320 8" Concrete Driveway 40.00 Sy 0220 610(i)6000 Tactile Warning Device-New 40.00 Sf 0230 611(g)0362 Inlet (Smd-Type 2b) 1.00 Ea 0240 619(a)6200 Removal Of Structures & Obstructions 1.00 Lsum 0250 619(b)6356 Removal Of Curb And Gutter 110.00 Lf 0260 619(b)6380 Removal Of Concrete Driveway 88.00 Sy 0270 619(b)6396 Removal Of Guardrail 150.00 Lf 0280 619(b)6404 Removal Of Sidewalk 176.00 Sy 0290 619(b)6408 Removal Of Concrete Slope Protection 244.00 Sy 0300 622(a)0210 1 1/2" Pipe Railing 404.00 Lf 0310 622(a)0220 2" Pipe Railing 160.00 Lf 0320 623(f)1764 Guardrail Trail End Turndown (31") 2.00 Ea 0330 623(i)2030 Guardrail Bridge Conn-Trail End (31") 2.00 Ea 0340 631(a)9210 (Sp)Removable Bollard 4.00 Ea 0350 632 0100 (Pl) Sitescaping 1.00 Lsum Section 0002 - Bridge 'a' Line No. Item No. Description Quantity 0360 501(b)1300 Substructure Excavation Common 240.00 Cy 0370 501(f)1700 Granular Backfill 50.00 Cy 0380 509(b)0320 Class a Concrete 23.00 Cy 0390 511(a)2210 Reinforcing Steel 1,620.00 Lb 0400 535 7170 Prefabricated Pedestrian Bridge 1.00 Ea Section 0003 - Traffic Line No. Item No. Description Quantity 0410 836 7100 Regulatory Or Warning Sign Assembly 4.00 Ea 0420 850(a)1200 Sheet Aluminum Signs 95.00 Sf 0430 851(c)2410 1 3/4" Square Tube Post 209.00 Lf 0440 854(a)6200 Traffic Stripe(Paint)(4" Wide) 2,808.00 Lf 0450 856(a)8216 Traffic Stripe(Multi-Poly.)(24" Wide) 192.00 Lf 0460 880(b)6300 Construction Signs 0 To 6.25 Sf 1,110.00 Sd 0470 880(b)6320 Construction Signs 16.0 Sf To 32.99 Sf 510.00 Sd 0480 880(c)6410 Construction Barricades(Type Iii) 120.00 Sd 0490 880(f)6700 Drums 870.00 Sd Section 0004 - Staking Line No. Item No. Description Quantity 0500 642(b)3300 Construction Staking Level Ii 1.00 Lsum Section 0005 - Construction Line No. Item No. Description Quantity 0510 220 1100 Swppp Documentation And Management 1.00 Lsum 0520 641 2110 Mobilization 1.00 Lsum

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents