Similar Projects
UV Replacement and Miscellaneous Improvements
Renovation
Bidding
$7,000,000 est. value
Birmingham, AL

Cahaba River and Trussville WRF and AL SEIER Pump Station Phase 3 Improvements
Renovation, Addition
Bidding
$45,000,000 est. value
Birmingham, Trussville, AL 35244

Econchate WPCP Primary Digester Cleaning and Sludge Removal
Post-Bid
AL

Contract 1. Wastewater Treatment System Improvements
Post-Bid
Mosses, AL 36040

Construction of the Expansion of the Bridgeport Wastewater Treatment Plant
Results
Less than $2,900,000 est. value
Bridgeport, AL 35740

Phosphorous Control Chemical Addition Improvements for the Five Mile Creek, Turkey Creek, Prudes Creek and Warrior WRFs
Results
Fultondale, AL 35068

Contract 2. Wastewater Collection System Expansion
Post-Bid
Mosses, AL 36040

Village Creek Water Reclamation Facility Chemical Storage and Feed Facilities
Results
$1,980,000 to $2,500,000 est. value
Birmingham, AL 35224

Wastewater Treatment Plant Upgrades
Post-Bid
Less than $1,500,000 est. value
West Blocton, Woodstock, AL

Hartselle Headworks Improvements Project
Results
$934,000 est. value
Hartselle, AL 35640

Phase II at Minooka Park for an Alternative Wastewater Treatment System
Post-Bid
Clanton, AL 35045

Self-Cleaning Channell Screen with Wash Press
Renovation
Results
Oxford, AL

Steel Fabricated Wastewater Treatment System
Post-Bid
Alexandria, AL 36250

Muscle Shoals Wastewater Treatment Plant Improvements
Results
Muscle Shoals, AL 35661

Contract No. 2 - Laney Lift Station Upgrade of the Tallassee WWTP and Collection System Improvements
Post-Bid
Tallassee, AL 36078

Last Updated 07/21/2021 04:51 PM
Project Title

Eastside WWTP Upgrades

Physical Address View project details and contacts
City, State (County) Opelika, AL   (Lee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of UV Disinfection System A UV system consisting of two lamp banks, control systems, and electrical modifications will be furnished and installed in an existing channel following demolition of existing UV equipment. - Micro Bar Screen A micro bar screen will be furnished and installed in an existing concrete well upstream of existing influent pumps. Site grading and concrete pavement will be required - Influent Wet Well Cleaning Settled residuals will be removed from the influent wastewater lift station wet well and hauled to a City-owned disposal site.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents