Similar Projects
Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Honeybee Discovery Center
New Construction
Conception
Orland, CA 95963

One Beverly Hills
New Construction, Renovation, Demolition - 1,933,436 SF
Design
Beverly Hills, CA 90210

1699 - 1701 Old Bayshore Highway
New Construction, Demolition - 482,180 SF
Design
$10,000,000 CJ est. value
Burlingame, CA 94010

RFP D/B - Roof Replacement and Solar Photovoltaic Project
Renovation
Bidding
$400,000 CJ est. value
San Diego, CA 92101

EV Charging Station - Battery Electric Vehicle Charging Station and Convenience Center
New Construction, Alteration
Post-Bid
$300,000 est. value
San Francisco, CA

Parking Lot Improvements Veterans Memorial Auditorium - Marin County
Infrastructure
Post-Bid
$3,860,000 CJ est. value
San Rafael, CA 94903

Santa Clara Convention Center Refresh Project
Renovation, Term Contract
Results
Santa Clara, CA 95054

Santa Ana Zoo Giant River Otter & Primate Trails
Renovation
Results
Santa Ana, CA 92701

The Venue at Thunder Valley Casino
New Construction
Construction
$100,000,000 est. value
Lincoln, CA 95648

30 Van Ness
New Construction - 824,000 SF
Construction
$244,000,000 est. value
San Francisco, CA 94102

Pico Boulevard Mixed-Use
New Construction, Infrastructure
Pending Verification
Los Angeles, CA 90019

Spring Street Hotel
New Construction, Infrastructure - 106,000 SF
Pending Verification
$32,000,000 CJ est. value
Los Angeles, CA 90014

670 Mesquit Building 3
New Construction
Conception
Los Angeles, CA 90021

Los Angeles Convention Center Expansion & Renovation
Addition, LEED Certification, New Construction, Infrastructure, Renovation - 2,200,000 SF
Design
$500,000,000 CJ est. value
Los Angeles, CA 90015

Last Updated 11/01/2022 06:35 AM
Project Title

SAFE Credit Union Convention Center Lighting and HVAC Systems

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95814   (Sacramento County)
Category(s) Entertainment/Recreation
Sub-Category(s) Convention/Exhibit Center
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Sacramento (City), Convention and Cultural Services Department is utilizing an RFP process for the selection of a design-build team to provide all equipment, material, labor, installation and delivery of a fully renovated and fully functional lighting and HVAC system to the second floor Ballroom B at the SAFE Credit Union Convention Center (1400 J Street, Sacramento, CA 95814) and a fully renovated and fully functional lighting system in Exhibit Halls C and D as detailed in the bid documents. Project Type RFP (Request for Proposal) Response Types Response File Type of Award Lump Sum Start/Delivery Date 1/1/2023 (estimated) Project Duration 9-10 months (estimated) Online Q&A Yes Q&A Deadline 08/30/2022 5:00 PM (PDT) Online Q and A - Yes, Any/all questions regarding this RFP should only be submitted via the City of Sacramento. All City responses to questions received will be posted as an addendum The scope of work is to provide all equipment, material, labor, installation and delivery of a fully renovated and fully functional lighting and HVAC system to the second floor Ballroom B at the SAFE Credit Union Convention Center (1400 J Street, Sacramento, CA 95814) and a fully renovated and fully functional lighting system in Exhibit Halls C and D. In both Ballroom B and Exhibit Halls C and D, the lights should tie into the new Lutron lighting system in place. The work includes, but is not limited to design, permitting, construction, commissioning and training. The selected Proposer will be required to provide physical assessment of existing conditions, provide detailed value engineering and construction cost estimates, constructability reviews, provide project phasing recommendations and develop project schedules.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents