Similar Projects
Football Stadium Parking Expansion
Infrastructure
Conception
$4,700,000 est. value
Paradise, CA 95969

CA Flap Red 2017(3) Sacramento Island Trail
Term Contract
Design
$1,600,000 est. value
Redding, CA

Structural Steel, Concrete Barrier, Furnish Polyester Conc. Overlay
Infrastructure
Bidding
$8,600,000 est. value
CA

Apply Polyester Concrete Overlay to Bridge Decks
Infrastructure
Bidding
$2,160,000 est. value
CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

Roadway Excavation, JPCP and Furnish Polyester Concrete Overlay
Infrastructure
Post-Bid
$22,300,000 est. value
CA

2021 Redwood Highway Frontage Road Pavement Repair Phase 1
Infrastructure
Results
$350,000 est. value
Mill Valley, CA 94941

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Citywide Street Rehabilitation Package 3-B (Phase 2)
Infrastructure
Bidding
$2,200,000 est. value
San Mateo, CA

Street Resurfacing On Federal-Aid Streets Fy2020-21
Alteration
Post-Bid
$2,618,546 est. value
Stockton, CA 95206

Richmond Residential Streets Pavement Renovation and Sewer Replacement
Infrastructure
Results
$7,300,000 est. value
San Francisco, CA

Tahoe Valley Stormwater and Greenbelt Improvement Project, Phase 1
Infrastructure
Bidding
$7,250,000 to $7,500,000 est. value
South Lake Tahoe, CA

Airport Pavement
Infrastructure
Post-Bid
Hayward, CA 94541

Bald Hills Road Resurfacing Project
Infrastructure
Results
Hoopa, CA 95546

Montalvo SRTS Cypress Point Gap Closure and Complete Streets Project
Infrastructure
Bidding
$1,500,000 est. value
Ventura, CA

Last Updated 05/23/2022 01:02 AM
Project Title

Dora Street Overlay Project

Physical Address View project details and contacts
City, State (County) Ukiah, CA 95482   (Mendocino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $739,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All of the work to be performed is within the City of Ukiah. South Dora St. from Luce Avenue to West Mill Street: The work involves complete surface wedge grinding down 2 and placing 2 AC overlay over existing asphalt concrete pavement. ADA curb ramps will be installed at locations shown per Plan. The Contractor should familiarize himself with the local conditions of the project site. Failure to do so will in no way relieve him of the responsibility for performing any of the work or operations required as a part of this contract

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents