Similar Projects
Cheshire Community Ymca
Alteration
Design
Southington, CT 06489

2610 Main Street Multi Family Townhome Buildings / Glastonbury
New Construction, Infrastructure
Design
$3,500,000 CJ est. value
Glastonbury, CT 06033

Site Upgrades at Elms Village, The Highlands, Rochambeau Apartments
Post-Bid
Hartford, CT 06108

Downtown Traffic Signal Improvements - Phase I
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Hartford, CT 06103

CY2021 Sidewalk Repairs and Reconstruction
Results
Windsor, CT

CY2021 Paving of Roadways
Results
Windsor, CT

Mastrianni Place Commercial Buildings
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Southington, CT 06489

Mastrianni Place Commercial Buildings
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Southington, CT 06489

New England Jewish Academy
Addition - 5,000 SF
Design
West Hartford, CT 06117

690 Cedar Street Apartments
New Construction, Infrastructure
Post-Bid
$40,000,000 CJ est. value
Newington, CT 06111

CY2021 Milling and Reclaiming of Roadways
Results
Windsor, CT

Loukopoulos Building E
New Construction, Infrastructure - 12,600 SF
Pending Verification
$2,500,000 CJ est. value
Southington, CT 06489

Exterior Lighting Upgrade and Site Improvements at Elms Village Apartments
Alteration
Post-Bid
East Hartford, CT

Renovations to Percival Soccer Field
Results
Berlin, CT

Art Studio
Renovation - 1,800 SF
Pending Verification
Bristol, CT 06010

Last Updated 10/21/2022 03:06 PM
Project Title

Wilson Gateway Park - Town of Windsor

Physical Address View project details and contacts
City, State (County) Windsor, CT 06095   (Hartford County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,820,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 21, 2022, an architect has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May 2023. *The closed solicitation has been included below for reference: The Town of Windsor is seeking a qualified professional planning and engineering firm or consultant to facilitate a community planning process that culminates in a Wilson Gateway Park Master Plan, including construction plans and bid specifications for Windsor, CT. The project will convert a vacant parcel at #458 Wilson Avenue into a multi-purpose public park that will bring neighborhood and community residents together in both informal and formal ways. The community vision for the park aims to achieve four goals: connect people and places, activate public space for individuals, families, and community, enhance the gateway to the neighborhood, and complement existing and future park network. The design may include elements such as passive recreation areas, flower gardens, pavilion, walking/exercise trails, gathering and community event space, and community gardens. Firms responding to this request should be of adequate size and sufficiently staffed to perform the assignment described above. Firms shall have successfully completed a minimum of 3 similar projects since 2015. The selected firm must meet all Municipal, State, and Federal affirmative action and equal employment opportunity practices. The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents