Similar Projects
Last Updated | 07/16/2021 06:02 PM |
Project Title | Gifford Park Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Elgin, IL (Kane County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 12,555 FT or 2.38 miles; The work shall include, but not limited to, hot-mix asphalt surface removal, hot-mix asphalt binder course, hot-mix asphalt surface course, concrete curb and gutter replacement, sidewalk replacement, thermoplastic pavement markings and all incidental and collateral work necessary to complete the project. Const. Variable Width Pav`t Resurfacing With Hma Surf. Cse., Mix d, n50 (3,610 Ton); Poly Hma Bind. Cse., Il-4.75, n50 (1,190ton); Hma Bind. Cse., Il-19, n50 (1,990 Ton); Hma Surf. Rem (Var. Depths) (31,800 Sq Yd); Pulverization (1,775 Foot); Pcc Sidewalk Rem & Repl (10,021 Sq Ft); Comb Conc c&g Rem & Repl (1,851 Foot); Thpl Pav`t Marking (Var. Widths) (2,572 Foot); Detector Loop Replacement (160 Foot); Etc. (2.38 Miles) |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |