Similar Projects
Reconstruction of Concrete Sidewalks and Incidental Work at Various Locations Zone 12-B
Term Contract
Bidding
$200,000 est. value
Wallingford, CT

Concrete ADA Ramp and Stair Replacement Project at John C. Mead School
Post-Bid
Ansonia, CT 06401

East Main Street Roadway Improvement Project
Post-Bid
Ansonia, CT 06401

Construction Contract for Prospect Street Parking Facility
Results
Waterbury, CT 06702

Pavement Restoration and Sidewalk Ramp Replacements
Results
Cheshire, CT

Downtown Community Connectivity Bike and Pedestrian Improvements
Infrastructure
Post-Bid
$669,765 est. value
Naugatuck, CT

PAL Parking Lot Reconstruction and COVID Enhancements
Results
Waterbury, CT 06704

Sidewalk, Driveway, Curb Repair and/or Replacement, Road Pavement Patching and Repair
Infrastructure
Post-Bid
West Haven, CT

Simpson Court Rear Parking Lot Improvements
Results
Wallingford, CT

Parking Lot Paving
Infrastructure
Post-Bid
Meriden, CT

Reconstruction of Concrete Curbing at Various Locations
Term Contract
Results
Wallingford, CT

Sidewalk Spot Repairs
Term Contract
Post-Bid
Meriden, CT

CDBG Inner City Sidewalks, Curbs and Ramps
Results
Meriden, CT

Construction of Parking Area
Infrastructure
Post-Bid
$1,200,000 est. value
Cheshire, CT 06410

Granite Curbs and Pavers
Term Contract
Results
New Haven, CT

Reported 07/14/2022 04:35 PM
Project Title

Route 79 Sidewalk - Concord Meadows to Route 1 - Town of Madison

Physical Address View project details and contacts
City, State (County) Madison, CT 06443   (New Haven County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a sidewalk / parking lot in Madison, Connecticut. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot. A full scope has not been determined. As of July 13, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents