Similar Projects
Brookwood HS and Dacula HS - Field House HVAC Project
Renovation
Sub-Bidding
$25,000 CJ est. value
Lawrenceville, GA 30044

Buice Center HVAC Renovations.
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Suwanee, GA 30024

Mechanical Equipment Replacement - 2022
Alteration
Post-Bid
$200,000 est. value
Norcross, GA 30071

Georgia Gwinnett College Chilled Water Distribution Phase 2C
Alteration
Post-Bid
$60,000 est. value
Lawrenceville, GA 30043

Gwinnett County Fire Station 19 HVAC Replacement Project
Renovation
Results
$621,555 CJ est. value
Lawrenceville, GA 30046

Fire Station No. 1 HVAC Replacement Project
Renovation - 6,979 SF
Results
$538,625 CJ est. value
Norcross, GA 30071

Gwinnett County E911 Center HVAC Upgrade Project
Renovation
Sub-Bidding
$170,000 CJ est. value
Lawrenceville, GA 30043

Harmony Elementary School - HVAC Renovations (ERU And RTU Replacement)
Renovation
Post-Bid
$200,000 CJ est. value
Buford, GA 30519

On-Demand HVAC Services
Term Contract
Sub-Bidding
Lawrenceville, GA 30046

HVAC System Maintenance, Repair, and Replacement Services
Term Contract
Post-Bid
Lawrenceville, GA 30044

Bethesda Elementary School - HVAC Modifications
Renovation
Sub-Bidding
$400,000 CJ est. value
Lawrenceville, GA 30044

Collins Hill High School - HVAC Modifications
Renovation
Post-Bid
$800,000 CJ est. value
Suwanee, GA 30024

Harris Elementary School HVAC Renovations
Renovation - 47,360 SF
Sub-Bidding
$200,000 CJ est. value
Duluth, GA 30096

Meadowcreek High School - HVAC Modifications
Renovation
Post-Bid
$800,000 CJ est. value
Norcross, GA 30093

Duluth High School HVAC Renovations
Renovation
Post-Bid
$300,000 CJ est. value
Duluth, GA 30096

Last Updated 01/04/2024 03:44 PM
Project Title

Parkview High School HVAC Modifications - Building 5080

Physical Address View project details and contacts
City, State (County) Lilburn, GA 30047   (Gwinnett County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Any bidder may be required, at the discretion of the Owner, to furnish evidence satisfactory to the Owner that his proposed subcontractors have sufficient means and experience in the types of work called for to assure completion of the contract in a satisfactory manner. Any bidder that is disqualified may respond to the Owner in writing within 20 days of the Notice of Disqualification as to why the bidder feels that the disqualification is unfounded. The written appeal from the disqualified bidder willnot change the decision already made on this project. However, a favorable appeal may open the way for the bidder in question to bid on future Gwinnett County Public School System projects. A copy of the bidding documents, including drawings and project manuals shall be available at the Architect=s office and the Owner=s office for viewing only. Contract, if awarded, will be on a lump sum basis. The bid may not be withdrawn for a period of sixty (60) days after date of opening. Bids must be accompanied by a bid bond payable to the Gwinnett County Board of Education, in an amount equal to five percent (5%) of the Base Bid Performance Bond and Labor and Material Payment Bond, each equal to 100% of the Contract Sum, will be required of the successful bidder. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia, be listed on "Department of the Treasury Circular 570" and have an A.M. Best Company rating of at least Class "A", with a Financial Size of VI or better. Bonds must be accompanied by letter stating company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement. Time is of the essence to the Contract performance. Notice to Proceed will be issued after the Pre-Construction meeting as soon as all required paperwork such as Contracts, Bonds, Insurance, etc. are in order. Contractor shall mobilize within ten (10) days of Notice to Proceed. Construction can begin during the school year on weekends and during student breaks as approved by the Owner. Full access to the building will begin on Thursday, May 23, 2024. All construction must be substantially complete by July 19, 2024. The Owner will make payments to the successful Contractor upon receipt of requests for payments, having been certified by the Architect, as fully covered and shown in the plans and specifications. Retainage as prescribed in the specifications and General Conditions of the Contract will be withheld.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents