Similar Projects
Lakeview Pumping Station - Electrical and Control Improvements - 39131 - City of Chicago
Renovation
Conception
$2,372,566 CJ est. value
Chicago, IL 60640

Cermak Pumping Station - Electrical Improvements - 3301 - City of Chicago
Renovation
Conception
$22,797,435 CJ est. value
Chicago, IL 60607

Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District
Renovation
Design
$1,000,000 to $5,000,000 est. value
Roxana, IL

Replacement of the Pumps, Piping, Back-up and Electrical Controls of the Pump Station
Infrastructure
Bidding
$200,000 CJ est. value
Benton, IL 62812

Taxiway K&L Pump Station
Renovation
Bidding
$1,000,000 CJ est. value
Chicago, IL 60666

Water Well No. 9 Electrical Improvements
Renovation
Sub-Bidding
$100,000 CJ est. value
Elk Grove Village, IL 60007

York Road (LS-10) and Thomas Foster (LS-15) Lift Station Improvements
Post-Bid
Bensenville, IL 60106

Forest Cove Sanitary Lift Station Replacement
Post-Bid
Waukegan, IL

Libertyville Booster Pump Station Replacement Sodium Hypochlorite System Design
Renovation
Results
Lake Bluff, IL

Harlem Avenue Lift Station Improvements
Results
Chicago Ridge, IL 60415

Kimundy Pump Station - Contract B
New Construction - 23,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Sandoval, IL 62882

Pump House Improvements - Village of Lincolnwood
Renovation, Infrastructure
Conception
$365,700 CJ est. value
Lincolnwood, IL 60712

Lift Station Rehabilitation - Bode Road - Village of Schaumburg
New Construction
Design
$350,000 est. value
Schaumburg, IL 60194

Well 34 - Water Treatment Facility
Demolition, New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Rockford, IL 61101

Last Updated 12/13/2022 03:09 PM
Project Title

City of Wilmington North Island Lift Station Re-bid

Physical Address View project details and contacts
City, State (County) Wilmington, IL 60481   (Will County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Full replacement of pumping system in existing lift station and installation of standby generator, and all other work required to provide a complete and operational system. Bidders are advised that this Contract will be subject to the Illinois Prevailing Wage Act. The successful Bidder shall provide at least 40% of all labor required for the completion of this project. The Bid shall be accompanied by a certified check or bid bond, in the amount of five percent (5%) of the gross amount of the bid and be payable to the order of the City of Wilmington. No Pre-Bid Meeting is scheduled. The bidder is encouraged to visit the site. Questions shall be directed to Don Bixby, 815-223-3344 or donb@chamlin.com. Bids may be held by the City of Wilmington for a period not to exceed 60 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The Owner reserves the right to accept or reject any or all Bids and to waive any informalities in the bidding.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents