Similar Projects
Patterson Road Sidewalk
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29209

Patterson Road Sidewalk
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29209

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

US 76 Safety Improvements in Richland County
Infrastructure
Design
$10,204,000 CJ est. value
Columbia, SC 29205

F-16 Mission Training Center Facility
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Hopkins, SC 29061

Jackson Creek Site Restoration Project
Infrastructure
Post-Bid
Columbia, SC 29206

Paving Projects
Infrastructure
Post-Bid
$250,000 to $350,000 est. value
Columbia, SC 29212

Bridge Replacement - US 1 (SCL RR)
New Construction, Infrastructure
Results
$13,320,000 est. value
SC

Intersection Improvements - SC 262
Infrastructure
Results
SC

Clutch Coffee / Columbia
New Construction, Infrastructure - 798 SF
Construction
$250,000 CJ est. value
Columbia, SC 29209

University of South Carolina Health Sciences Campus
New Construction, Infrastructure - 292,000 SF
Pending Verification
$300,000,000 CJ est. value
Columbia, SC 29209

Finlay Park Development
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Columbia, SC 29201

RFP - Stream Restoration at Forty Acre Hp
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29201

Sidewalk Package S11 Polo Road and Harrison Road Sidewalks
Infrastructure
Design
$4,672,637 CJ est. value
Columbia, SC 29206

Construction of Forest Acres Park and Vehicular Bridge Replacement
Renovation, Infrastructure
Post-Bid
$2,000,000 to $3,000,000 est. value
Columbia, SC

Last Updated 02/20/2023 12:03 AM
Project Title

US 76 over US 601

Physical Address View project details and contacts
City, State (County) Columbia, SC 29205   (Richland County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $9,648,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Type Bridge Replacement As of February 20, 2023, the project is in Final Planning status. Anticipated letting month/year is May, 2023. SCDOT - US 76 over US 601 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents