Similar Projects
Nelson Worldwide Mixed Use
New Construction
Conception
Suwanee, GA 30024

Roof Recoat of 426 Canton Highway
Results
Cumming, GA 30040

2022 Cumming Aquatic Center Roof Renovation
Alteration
Post-Bid
$200,000 est. value
Cumming, GA 30040

Administrative Offices and Cumming Branch - Library
Renovation
Post-Bid
$2,000,000 est. value
Cumming, GA 30040

Continuum Alpharetta
New Construction - 507,000 SF
Pending Verification
$10,000,000 CJ est. value
Alpharetta, GA 30004

FCS Administrative Renovations
Renovation - 32,751 SF
Results
Cumming, GA 30040

Denmark Library - Forsyth County
New Construction - 32,000 SF
Design
$11,900,000 est. value
Alpharetta, GA 30004

Hampton Park Roof
Renovation
Results
$136,913 CJ est. value
Cumming, GA 30041

Hampton Park Roof
Renovation
Results
$136,913 CJ est. value
Cumming, GA 30041

Residential Roof Repair For (10) Ten Houses
Results
Macon, GA

Roof Repairs for Forsyth County Health Department
Results
Cumming, GA 30040

Lake Parks Shady Grove Bathhouse Roof Replacement
Alteration
Results
$1,000,000 est. value
Cumming, GA 30041

Denmark Library
New Construction
Conception
Cumming, GA 30004

Halcyon - Building 1100
New Construction - 52,000 SF
Post-Bid
Alpharetta, GA

Post Road LED Light Upgrade
Renovation
Results
$400,000 CJ est. value
Cumming, GA 30040

Last Updated 07/25/2022 12:20 AM
Project Title

Roof Condensation Issues

Physical Address View project details and contacts
City, State (County) Cumming, GA 30040   (Forsyth County)
Category(s) Commercial, Government/Public, Single Trades
Sub-Category(s) Library - Public, Office, Roofing
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Forsyth County Public Library is accepting bids for materials, equipment and labor to resolve roof condensation issues at the Administrative Offices and Cumming Library located at 585 Dahlonega Street, Cumming, GA 30040. No interpretation of the meaning of the specifications or other bid documents will be made orally. Every request for such interpretations must be sent in writing to Tonya Wallace at wallacet@forsythpl.org to be given consideration and must be received by 5:00 PM Eastern Time on July 1, 2022. Any and all such interpretations and any supplemental instructions will be in the form of written Addenda to the Specifications which, if issued, will be made available on the project website. Addenda will be provided by July 7, 2022 at 5:00 PM Eastern Time. All work MUST be completed by March 1, 2023. The Library reserves the right to reject any or all bids and to waive technicalities. Bids received will become the property of FCPL and shall be used as the Library sees fit. All information contained in the bids will remain confidential until after the award and signing of the contract. Good workmanship shall be apparent in the installation of all electrical materials and equipment. Permanence and neat appearance are a part of good workmanship. Equipment shall be level, plumb and true with the structure and other equipment, also in a Horizontal or vertical position as intended. All materials shall be firmly secured in place, adequately supported, and permanent. Equipment boxes / devices shall be fastened to prevent horizontal and vertical sway. All hardware, fittings, and accessories shall be of a type designed, intended and appropriate for use and complement the items with which they are used. All materials and equipment including hangers, supports, fasteners or fittings, and accessories shall have corrosion protection suitable for the atmosphere in which they are installed (whether located indoors or outdoors). Care shall be taken during the installation to assure the integrity of the corrosion protection. Damaged corrosion protection shall be repaired during or after installation. All screws, bolts, nuts, clamps, fittings, or other fastening devices shall be made up tight in accordance with manufacturers' and/or listing instructions. Plans and specifications shall be carefully followed when installing equipment.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents