Similar Projects
Armor Joint Repairs and Joint Sealing on Various Roads and Bridges, Precinct 3
Results
Houston, TX

Driveway Resurface Project
Results
$100,000 to $250,000 est. value
Denton, TX 76209

Blanco Road Phase II
Results
$19,200,000 est. value
San Antonio, TX 78207

2019-2020 Microsurface Toc Package 1
Results
$3,000,000 est. value
San Antonio, TX

Harvest Townside Phase 2 Paving
Results
TX

Harvest Townside Phase 2 Mass Grading
Results
TX

Southern Region Disaster Recovery Support BPA
Results

Last Updated 02/07/2020 09:13 AM
Project Title

Preventive Maintenance

Physical Address View project details and contacts
City, State (County) TX   (Johnson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,136,160
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

340 6247 d-Gr Hma (Sq) Ty-d Pg 70-22(Level-Up) Ton 1,730.000 1 347 6001 Tom (Asphalt) Pg 76-22 Ton 115.000 2 347 6002 Tom-c (Aggregate) Sac-a Ton 1,530.000 3 351 6008 Flexible Pavement Structure Repair(12") Sy 11,465.000 4 354 6097 Plane & Text Asph Conc (3/4") Sy 37,942.000 5 354 6113 Plan & Text Asph Conc Pav (2") Sy 180,331.000 6 361 6006 Full - Depth Repair Crcp (12") Sy 15,000.000 7 432 6045 Riprap (Mow Strip)(4 In) Cy 80.000 8 483 6014 Diamond Grinding Slab Sy 287,920.000 9 500 6001 Mobilization Ls 1.000 10 502 6001 Barricades, Signs And Traffic Handling Mo 12.000 11 506 6042 Biodeg Erosn Cont Logs (Instl) (18") Lf 500.000 12 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 500.000 13 540 6001 Mtl w-Beam Gd Fen (Tim Post) Lf 900.000 14 540 6006 Mtl Beam Gd Fen Trans (Thrie-Beam) Ea 16.000 15 540 6016 Downstream Anchor Terminal Section Ea 16.000 16 542 6001 Remove Metal Beam Guard Fence Lf 1,675.000 17 542 6002 Remove Terminal Anchor Section Ea 2.000 18 542 6004 Rm Mtl Bm Gd Fence Trans (Thrie-Beam) Ea 16.000 19 544 6001 Guardrail End Treatment (Install) Ea 2.000 20 544 6003 Guardrail End Treatment (Remove) Ea 16.000 21 658 6061 Instl Del Assm (d-Sw)Sz 1(Brf)Gf2 Ea 25.000 22 658 6064 Instl Del Assm (d-Sy)Sz 1(Brf)Gf2 Ea 25.000 23 662 6060 Wk Zn Pav Mrk Remov (w)4"(Brk) Lf 2,573.000 24 662 6071 Wk Zn Pav Mrk Remov (w)8"(Sld) Lf 2,402.000 25 662 6073 Wk Zn Pav Mrk Remov (w)12"(Sld) Lf 1,068.000 26 662 6093 Wk Zn Pav Mrk Remov (y)4"(Brk) Lf 590.000 27 662 6095 Wk Zn Pav Mrk Remov (y)4"(Sld) Lf 4,608.000 28 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty w Ea 6,990.000 29 662 6111 Wk Zn Pav Mrk Sht Term (Tab)Ty y-2 Ea 6,117.000 30 666 6032 Refl Pav Mrk Ty i (w)8"(Lndp)(090mil) Lf 2,566.000 31 666 6035 Refl Pav Mrk Ty i (w)8"(Sld)(090mil) Lf 12,402.000 32 666 6041 Refl Pav Mrk Ty i (w)12"(Sld)(090mil) Lf 1,068.000 33 666 6047 Refl Pav Mrk Ty i (w)24"(Sld)(090mil) Lf 576.000 34 666 6053 Refl Pav Mrk Ty i (w)(Arrow)(090mil) Ea 43.000 35 666 6077 Refl Pav Mrk Ty i (w)(Word)(090mil) Ea 30.000 36 666 6137 Refl Pav Mrk Ty i (y)8"(Sld)(090mil) Lf 1,000.000 37 666 6140 Refl Pav Mrk Ty i (y)12"(Sld)(090mil) Lf 10,000.000 38 666 6167 Refl Pav Mrk Ty Ii (w) 4" (Brk) Lf 14,256.000 39 666 6170 Refl Pav Mrk Ty Ii (w) 4" (Sld) Lf 57,024.000 40 666 6177 Refl Pav Mrk Ty Ii (w) 8" (Lndp) Lf 2,500.000 41 666 6178 Refl Pav Mrk Ty Ii (w) 8" (Sld) Lf 10,000.000 42 666 6207 Refl Pav Mrk Ty Ii (y) 4" (Sld) Lf 57,024.000 43 666 6211 Refl Pav Mrk Ty Ii (y) 8" (Sld) Lf 1,000.000 44 666 6212 Refl Pav Mrk Ty Ii (y) 12" (Sld) Lf 10,000.000 45 666 6299 Re Pm w/Ret Req Ty i (w)4"(Brk)(090mil) Lf 19,974.000 46 666 6302 Re Pm w/Ret Req Ty i (w)4"(Sld)(090mil) Lf 162,145.000 47 666 6311 Re Pm w/Ret Req Ty i (y)4"(Brk)(090mil) Lf 9,105.000 48 666 6314 Re Pm w/Ret Req Ty i (y)4"(Sld)(090mil) Lf 147,575.000 49 672 6007 Refl Pav Mrkr Ty i-c Ea 1,296.000 50 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 1,025.000 51 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 725.000 52 785 6001 Bridge Joint Repair (Concrete) Lf 1,600.000 53 3077 6022 Sp Mixes Sp-c Sac-a Pg70-22 Ton 20,230.000 54 6001 6001 Portable Changeable Message Sign Day 320.000 55 6185 6002 Tma (Stationary) Day 189.000 56 6185 6003 Tma (Mobile Operation) Hr 960.000 57

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents