Similar Projects
Last Updated | 05/03/2022 07:25 AM |
Project Title | Resurfacing on S.R. 140 from S.R. 22 (L.M. 0.00) to near S.R. 54 (L.M. 10.00) |
Physical Address | View project details and contacts |
City, State (County) | TN (Henry County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project No. HSIP-140(22), 40S140-M8-003 (PIN 123898.00), 40S140-F3-003 (PIN 123898.00) The resurfacing on S.R. 140 from S.R. 22 (L.M. 0.00) to near S.R. 54 (L.M. 10.00).Project Length - 10.000 miles Project No. HSIP-140(23), 40S140-M8-004 (PIN 123899.00), 40S140-F3-004 (PIN 123899.00) The resurfacing on S.R. 140 from near S.R. 54 (L.M. 10.00) to near Wagner Road (L.M. 13.24).Project Length - 3.240 miles Project No. HSIP-140(24), 40S140-M8-005 (PIN 127376.00), 40S140-F3-005 (PIN 127376.00) The resurfacing on S.R. 140 from near Wagner Road (L.M. 13.24) to S.R. 69 (L.M. 19.69).Project Length - 6.450 miles 202-03 Removal Of Rigid Pavement, Sidewalk, Etc. 87.000 s.y. 208-01.05 Brooming & Degrassing Shoulders 39.380 l.m. 403-01.10 High Performance Fog Seals 66.000 s.y. 405-01.01 Bituminous Material (Bsc) 617.000 Ton 405-01.02 Mineral Aggregate (Bsc) 5,662.000 Ton 604-01.02 Steel Bar Reinforcement (Roadway) 50.000 Lb. 701-01.01 Concrete Sidewalk (4 ") 246.000 s.f. 701-02.03 Concrete Curb Ramp 364.000 s.f. 702-01 Concrete Curb 1.000 c.y. 705-02.10 Guardrail Transition 27in To 31in 26.000 Each 705-06.30 Gr Terminal (Energy Absorbing) Mash Tl-2 26.000 Each 712-01 Traffic Control (1) Ls 712-06 Signs (Construction) 3,330.000 s.f. 712-07.03 Temporary Barricades (Type Iii) 12.000 l.f. 716-01.30 Removal Of Snowplowable Reflective Marker 378.000 Each 716-02.03 Plastic Pavement Marking (Cross-Walk) 93.000 l.f. 716-02.04 Plastic Pavement Marking(Channelization Striping) 4.000 s.y. 716-02.05 Plastic Pavement Marking (Stop Line) 300.000 l.f. 716-03.03 Plastic Word Pavement Marking (Stop Ahead) 4.000 Each 716-05.08 Painted Pavement Marking (Parking Line) 90.000 l.f. 716-05.20 Painted Pavement Marking (6" Line) 131.720 l.m. 716-08.04 Removal Of Pavement Marking (Channelization Striping) 8.000 s.y. 716-08.05 Removal Of Pavement Marking (Stop Line) 75.000 l.f. 716-08.11 Removal Of Word Pavement Marking (Description) (Stop Ahead) 4.000 Each 716-08.20 Removal Of Pavement Marking (Line) 78.760 l.m. 716-12.02 Enhanced Flatline Thermo Pvmt Mrkng (6in Line) 78.760 l.m. 717-01 Mobilization (1) Ls |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |